Difference between revisions of "Action Items"
From Makers Local 256
(add secondary simple list of todo items, please promote items to the critical list as necessary) |
m (→The To Do List: remove completed item) |
||
Line 25: | Line 25: | ||
** install railing that will support a 300lb lean | ** install railing that will support a 300lb lean | ||
* finish unpacking all boxes | * finish unpacking all boxes | ||
− | |||
* get the overhead door fixed | * get the overhead door fixed | ||
* front door | * front door |
Revision as of 13:03, 28 April 2009
The Critical List
On this list exist items that are essential to the operation of the Make Shop.
Item | Owner | Status | ETA |
---|---|---|---|
Get AL lawyer to audit form for AL caveats | Mog | To get response next week | May Meeting |
Schedule a time for a power tools class | Bob | TBD | May Meeting |
Move finances over to GNU Cach | Jeff | TBD | June Meeting |
Have powerbolt metal keys cut for board memebers | Jeff | Pending PB install | After powerbolt put on |
Revisit pledging members contributions and Board members' lessening contributions | Everyone | TBD | Jan 2010 |
Submit Form 990-N to IRS (assuming Makers Local is not grossing $25k) | Treasurer | Yearly | April 2010 |
The To Do List
- get old shop cleaned up
- get slow building drain fixed
- railing
- remove metal pipe railing
- install railing that will support a 300lb lean
- finish unpacking all boxes
- get the overhead door fixed
- front door
- finish front door
- install USB authentication hardware
- pegboards
- tools
- designate location for tool storage
- electronics
- designate location for electronics lab
- tools
- find brimstone's missing items
- SPA942 linksys sip phone
- box of digium cards
- build tables
- finalize design
- get materials
- build HC style air filters
- get materials
- conserve energy
- use natural lighting where possible during the day