# Lewters sells Barrel Nuts, so if the ones I ordered don't arrive soon - get some from there. (consolation: I didn't order enough anyway) (DONE - 26OCT10) | # Lewters sells Barrel Nuts, so if the ones I ordered don't arrive soon - get some from there. (consolation: I didn't order enough anyway) (DONE - 26OCT10) | ||
# Put the Table together. | # Put the Table together. | ||
− | ## X-axis | + | ## X-axis (DONE 28OCT10) |
### 2'x 4' MDF sections bolted together (DONE 27OCT10) | ### 2'x 4' MDF sections bolted together (DONE 27OCT10) | ||
− | ### Rails attached ( | + | ### Rails attached (DONE 28OCT10) |
− | ### Ends attached ( | + | ### Ends attached (DONE 28OCT10) |
## Y-axis | ## Y-axis | ||
+ | ### Drill Holes in Gantry Sides (DONE 28OCT10) | ||
+ | ### Attach B.R.A.s (Holes Drilled) | ||
+ | ### Assemble Gantry | ||
## Z-axis | ## Z-axis | ||
# Get miscellaneous parts (Drive Couplings) (DONE 27OCT10) | # Get miscellaneous parts (Drive Couplings) (DONE 27OCT10) |
Revision as of 20:57, 28 October 2010
Creator: |
Overview
A medium sized CNC Machine capable of cutting patterns
The Plan
- This project's focus is on implementing basic (though scalable) CNC functionality.
Progress
- Most of the Parts are ordered.
- The wood has been cut, but not fitted.
- Sourced Barrel Nuts locally
- Electronics and Steppers are in
- stepper/drive screw couplings ordered but not arriving til monday or tuesday
- table-top assembled (omg its heavy)
Parts List
Part | Number | Price |
---|---|---|
2'x 4'x 3/4" MDF | 4 | $45 |
608ZZ Bearings (BRA) | 24 | $18 |
R8zz Bearings | 6 | $13 |
Aluminium Angle Bracket (1" x 1/8" x 36") | 1 | ? |
NEMA 23 Steppers | 3 | |
240W DC Power Supply | 1 | |
CNC Controller Kit (china) | 1 | $160 |
1/2" x 10' Threaded Rod (drive screws) | 1 | $30 |
1/4" to 1/2" Drive Coupling | 3 | $40 |
Limit Switches | 6 | $10 |
Sub Total | ~$316 |
Next Steps
- Lewters sells Barrel Nuts, so if the ones I ordered don't arrive soon - get some from there. (consolation: I didn't order enough anyway) (DONE - 26OCT10)
- Put the Table together.
- X-axis (DONE 28OCT10)
- 2'x 4' MDF sections bolted together (DONE 27OCT10)
- Rails attached (DONE 28OCT10)
- Ends attached (DONE 28OCT10)
- Y-axis
- Drill Holes in Gantry Sides (DONE 28OCT10)
- Attach B.R.A.s (Holes Drilled)
- Assemble Gantry
- Z-axis
- X-axis (DONE 28OCT10)
- Get miscellaneous parts (Drive Couplings) (DONE 27OCT10)
- Wait for the Control Equipment to arrive from China. (ARRIVED- 27OCT10)
Resources
Ideas
- I'll probably want to go with a belt drive system for the 4'x 8' iteration.