Difference between revisions of "2x4 CNC Machine"

From Makers Local 256
Jump to: navigation, search
m (Progress)
(Next Steps - finished x axis)
Line 73: Line 73:
 
# Lewters sells Barrel Nuts, so if the ones I ordered don't arrive soon - get some from there. (consolation: I didn't order enough anyway) (DONE - 26OCT10)
 
# Lewters sells Barrel Nuts, so if the ones I ordered don't arrive soon - get some from there. (consolation: I didn't order enough anyway) (DONE - 26OCT10)
 
# Put the Table together.
 
# Put the Table together.
## X-axis
+
## X-axis (DONE 28OCT10)
 
### 2'x 4' MDF sections bolted together (DONE 27OCT10)
 
### 2'x 4' MDF sections bolted together (DONE 27OCT10)
### Rails attached (Rails Cut)
+
### Rails attached (DONE 28OCT10)
### Ends attached (holes drilled in 2x4s but not in Ends)
+
### Ends attached (DONE 28OCT10)
 
## Y-axis
 
## Y-axis
 +
### Drill Holes in Gantry Sides (DONE 28OCT10)
 +
### Attach B.R.A.s (Holes Drilled)
 +
### Assemble Gantry
 
## Z-axis
 
## Z-axis
 
# Get miscellaneous parts (Drive Couplings) (DONE 27OCT10)  
 
# Get miscellaneous parts (Drive Couplings) (DONE 27OCT10)  

Revision as of 20:57, 28 October 2010

Creator:
EnabrinTain
Status:
Assembly
Born On:
22 Oct 2010 (CDT)
Last Updated:
20:57, 28 October 2010 (CDT)

Overview

A medium sized CNC Machine capable of cutting patterns

The Plan

  • This project's focus is on implementing basic (though scalable) CNC functionality.

Progress

  • Most of the Parts are ordered.
  • The wood has been cut, but not fitted.
  • Sourced Barrel Nuts locally
  • Electronics and Steppers are in
  • stepper/drive screw couplings ordered but not arriving til monday or tuesday
  • table-top assembled (omg its heavy)

Parts List

Part Number Price
2'x 4'x 3/4" MDF 4 $45
608ZZ Bearings (BRA) 24 $18
R8zz Bearings 6 $13
Aluminium Angle Bracket (1" x 1/8" x 36") 1  ?
NEMA 23 Steppers 3
240W DC Power Supply 1
CNC Controller Kit (china) 1 $160
1/2" x 10' Threaded Rod (drive screws) 1 $30
1/4" to 1/2" Drive Coupling 3 $40
Limit Switches 6 $10
Sub Total ~$316

Next Steps

  1. Lewters sells Barrel Nuts, so if the ones I ordered don't arrive soon - get some from there. (consolation: I didn't order enough anyway) (DONE - 26OCT10)
  2. Put the Table together.
    1. X-axis (DONE 28OCT10)
      1. 2'x 4' MDF sections bolted together (DONE 27OCT10)
      2. Rails attached (DONE 28OCT10)
      3. Ends attached (DONE 28OCT10)
    2. Y-axis
      1. Drill Holes in Gantry Sides (DONE 28OCT10)
      2. Attach B.R.A.s (Holes Drilled)
      3. Assemble Gantry
    3. Z-axis
  3. Get miscellaneous parts (Drive Couplings) (DONE 27OCT10)
  4. Wait for the Control Equipment to arrive from China. (ARRIVED- 27OCT10)

Resources

Ideas

  • I'll probably want to go with a belt drive system for the 4'x 8' iteration.