Difference between revisions of "We Need to Move"

From Makers Local 256
Jump to: navigation, search
m (Bleh)
m (Added 203 BStreet)
Line 1: Line 1:
{{Project|Creator=User Name
 
|Status=<onlyinclude> Your Status </onlyinclude>                                <!--LEAVE ONLYINCLUDES FOR STATUS HACK-->
 
|Born On=23:13, 19 April 2011 (CDT)                                                                  <!--DO NOT EDIT -->
 
|Last Updated={{#time: H:i, d F Y| {{REVISIONTIMESTAMP}} }} (CDT)              <!--DO NOT EDIT -->
 
}}
 
 
 
= 5 Points Shop =
 
= 5 Points Shop =
== Our To Dos for an Operational & Insurable Shop ==
+
== To Dos for an Operational & Insurable Shop ==
Listed in Order of Priority
+
Listed in Order of Priority/Sequence
 +
# Resolve a Lease with Hal
 
# Reinforce Loft Structure
 
# Reinforce Loft Structure
 
#* Frame & Struts - Landlord Responsibility  
 
#* Frame & Struts - Landlord Responsibility  
Line 28: Line 23:
 
# Plumbing - Our Responsibility, actions dependent on what we plan to do.
 
# Plumbing - Our Responsibility, actions dependent on what we plan to do.
 
# Ventilation - Our Responsibility, actions dependent on what we plan to do.
 
# Ventilation - Our Responsibility, actions dependent on what we plan to do.
 +
= 203 Brown St =
 +
== To Dos for Moving Out ==
 +
Listed in Order of Priority/Sequence
 +
# Resolve Lease Termination with Mike - Ours and Landlord Responsibility
 +
# Clean Up Shop - Our Responsibility
 +
# Transfer Utilities and Insurance - Our Responsibility
 +
# Pack and transport possessions to new shop - Our Responsibility

Revision as of 23:17, 19 April 2011

5 Points Shop

To Dos for an Operational & Insurable Shop

Listed in Order of Priority/Sequence

  1. Resolve a Lease with Hal
  2. Reinforce Loft Structure
    • Frame & Struts - Landlord Responsibility
    • Floor Plating - Our Responsibility
      • Lay Down Plywood - Build to Code before loading with furniture and gear. Need to make it to spec for insurance.
  3. Reinforce & Widen Stairway - Our Responsibility
    • TinkerBuddah/Josh Carr said that he could do it to code in 3 hours.
  4. Lights - Landlord Responsibility
  5. 11'x15' Room Under Loft - Our Responsibility
    • Currently 2x4 Wall Frame not to code. Vertical spars need to be at least 16" apart. They are further apart than that. Additional spars need to be added, insulation filled in and then the wall covered with plywood and drywall. Can become additional heated/cooled space.
  6. Ceiling Fan in Office - Landlord Responsibility
  7. Kitchen
    • Installation of 220V - Our Responsibility, Alternative is to use 110 for a hot plate, crock pot, toaster over, microwave, ect.
  8. Roof
    • Gutter Cleaning - Landlord Responsibility
    • Roof Cleaning & Repair (Skylight) - Our Responsibility
  9. Networking - Comcast Responsibility
  10. Electrical Test - Our Responsibility
  11. Garbage Area - Our Responsibility. Will be shut down and loose pieces stored in refurbishable condition for next tenant.
  12. Plumbing - Our Responsibility, actions dependent on what we plan to do.
  13. Ventilation - Our Responsibility, actions dependent on what we plan to do.

203 Brown St

To Dos for Moving Out

Listed in Order of Priority/Sequence

  1. Resolve Lease Termination with Mike - Ours and Landlord Responsibility
  2. Clean Up Shop - Our Responsibility
  3. Transfer Utilities and Insurance - Our Responsibility
  4. Pack and transport possessions to new shop - Our Responsibility