Difference between revisions of "We Need to Move"
From Makers Local 256
Spacefelix (Talk | contribs) m (Final List) |
Spacefelix (Talk | contribs) m (→To Dos for an Operational & Insurable Shop: added insurance) |
||
Line 9: | Line 9: | ||
#** Lay Down Plywood - Build to Code before loading with furniture and gear. Need to make it to spec for insurance. | #** Lay Down Plywood - Build to Code before loading with furniture and gear. Need to make it to spec for insurance. | ||
# Reinforce & Widen Stairway - Our Responsibility | # Reinforce & Widen Stairway - Our Responsibility | ||
− | #* TinkerBuddah/Josh Carr said that he could do it to code in 3 hours. | + | #* TinkerBuddah/Josh Carr said that he could do it to code in 3 hours. Need to make it to spec for insurance. |
# 11'x15' Room Under Loft - Our Responsibility | # 11'x15' Room Under Loft - Our Responsibility | ||
− | #* Currently 2x4 Wall Frame not to code. Vertical spars need to be at least 16" apart. They are further apart than that. Additional spars need to be added, insulation filled in and then the wall covered with plywood and drywall. Can become additional heated/cooled space. | + | #* Currently 2x4 Wall Frame not to code. Vertical spars need to be at least 16" apart. They are further apart than that. Additional spars need to be added, insulation filled in and then the wall covered with plywood and drywall. Can become additional heated/cooled space. Need to make it to spec for insurance. |
# Roof | # Roof | ||
#* Gutter Cleaning - Landlord Responsibility | #* Gutter Cleaning - Landlord Responsibility | ||
Line 23: | Line 23: | ||
# Ventilation - Our Responsibility, actions dependent on what we plan to do. | # Ventilation - Our Responsibility, actions dependent on what we plan to do. | ||
# Ceiling Fan in Office - Landlord Responsibility | # Ceiling Fan in Office - Landlord Responsibility | ||
+ | |||
= 203 Brown St = | = 203 Brown St = | ||
== To Dos for Moving Out == | == To Dos for Moving Out == |
Revision as of 23:42, 19 April 2011
Contents
[hide]5 Points Shop
To Dos for an Operational & Insurable Shop
Listed in Order of Priority/Sequence
- Resolve a Lease with Hal
- Lights - Landlord Responsibility
- Reinforce Loft Structure
- Frame & Struts - Landlord Responsibility
- Floor Plating - Our Responsibility
- Lay Down Plywood - Build to Code before loading with furniture and gear. Need to make it to spec for insurance.
- Reinforce & Widen Stairway - Our Responsibility
- TinkerBuddah/Josh Carr said that he could do it to code in 3 hours. Need to make it to spec for insurance.
- 11'x15' Room Under Loft - Our Responsibility
- Currently 2x4 Wall Frame not to code. Vertical spars need to be at least 16" apart. They are further apart than that. Additional spars need to be added, insulation filled in and then the wall covered with plywood and drywall. Can become additional heated/cooled space. Need to make it to spec for insurance.
- Roof
- Gutter Cleaning - Landlord Responsibility
- Roof Cleaning & Repair (Skylight) - Our Responsibility
- Kitchen
- Installation of 220V - Our Responsibility, Alternative is to use 110 for a hot plate, crock pot, toaster over, microwave, ect.
- Networking - Comcast Responsibility
- Electrical Test - Our Responsibility
- Garbage Area - Our Responsibility. Will be shut down and loose pieces stored in refurbishable condition for next tenant.
- Plumbing - Our Responsibility, actions dependent on what we plan to do.
- Ventilation - Our Responsibility, actions dependent on what we plan to do.
- Ceiling Fan in Office - Landlord Responsibility
203 Brown St
To Dos for Moving Out
Listed in Order of Priority/Sequence
- Resolve Lease Termination with Mike - Ours and Landlord Responsibility
- Clean Up Shop - Our Responsibility
- Transfer Utilities and Insurance - Our Responsibility
- Pack and transport possessions to new shop - Our Responsibility