= Overview =
+
= The Critical List =
 
On this list exist items that are essential to the operation of the Make Shop.  
 
On this list exist items that are essential to the operation of the Make Shop.  
 
= The List =
 
 
{|
 
{|
 
! Item !! Owner !! Status !! ETA
 
! Item !! Owner !! Status !! ETA
Line 19: Line 17:
 
|-
 
|-
 
|}
 
|}
 +
 +
= The To Do List =
 +
* get old shop cleaned up
 +
* get slow building drain fixed
 +
* railing
 +
** remove metal pipe railing
 +
** install railing that will support a 300lb lean
 +
* finish unpacking all boxes
 +
* make sure the storage loft and shelves are kilzed
 +
* get the overhead door fixed
 +
* front door
 +
** finish front door
 +
** install USB authentication hardware
 +
* pegboards
 +
** tools
 +
*** designate location for tool storage
 +
** electronics
 +
*** designate location for electronics lab
 +
* find brimstone's missing items
 +
** SPA942 linksys sip phone
 +
** box of digium cards
 +
* build tables
 +
** finalize design
 +
** get materials
 +
* build HC style air filters
 +
** get materials
 +
* conserve energy
 +
** use natural lighting where possible during the day

Revision as of 13:02, 28 April 2009

The Critical List

On this list exist items that are essential to the operation of the Make Shop.

Item Owner Status ETA
Get AL lawyer to audit form for AL caveats Mog To get response next week May Meeting
Schedule a time for a power tools class Bob TBD May Meeting
Move finances over to GNU Cach Jeff TBD June Meeting
Have powerbolt metal keys cut for board memebers Jeff Pending PB install After powerbolt put on
Revisit pledging members contributions and Board members' lessening contributions Everyone TBD Jan 2010
Submit Form 990-N to IRS (assuming Makers Local is not grossing $25k) Treasurer Yearly April 2010

The To Do List

  • get old shop cleaned up
  • get slow building drain fixed
  • railing
    • remove metal pipe railing
    • install railing that will support a 300lb lean
  • finish unpacking all boxes
  • make sure the storage loft and shelves are kilzed
  • get the overhead door fixed
  • front door
    • finish front door
    • install USB authentication hardware
  • pegboards
    • tools
      • designate location for tool storage
    • electronics
      • designate location for electronics lab
  • find brimstone's missing items
    • SPA942 linksys sip phone
    • box of digium cards
  • build tables
    • finalize design
    • get materials
  • build HC style air filters
    • get materials
  • conserve energy
    • use natural lighting where possible during the day