We Need to Move
From Makers Local 256
Revision as of 23:03, 19 April 2011 by Spacefelix (Talk | contribs)
5 Points Shop
Our To Dos for an Operational & Insurable Shop
Listed in Order of Priority
- Reinforce Loft Structure
- Frame & Struts - Landlord Responsibility
- Floor Plating - Our Responsibility
- Lay Down Plywood - Build to Code before loading with furniture and gear. Need to make it to spec for insurance.
- Reinforce & Widen Stairway - Our Responsibility
- TinkerBuddah/Josh Carr said that he could do it to code in 3 hours.
- Lights - Landlord Responsibility
- 11'x15' Room Under Loft - Our Responsibility
- Currently 2x4 Wall Frame not to code. Vertical spars need to be at least 16" apart. They are further apart than that. Additional spars need to be added, insulation filled in and then the wall covered with plywood and drywall. Can become additional heated/cooled space.
- Ceiling Fan in Office - Landlord Responsibility
- Kitchen
- Installation of 220V, Our Responsibility