We Need to Move
From Makers Local 256
Contents
[hide]5 Points Shop
To Dos for an Operational & Insurable Shop
Listed in Order of Priority/Sequence
- Resolve a Lease with Hal - In Work by Mog & CrashCart, ECD 4/21/11.
- Lights - Landlord Responsibility
- Reinforce Loft Structure
- Frame & Struts - Landlord Responsibility
- Floor Plating - Our Responsibility
- Lay Down Plywood - Build to Code before loading with furniture and gear. Need to make it to spec for insurance.
- Reinforce & Widen Stairway - Our Responsibility
- TinkerBuddah/Josh Carr said that he could do it to code in 3 hours. Need to make it to spec for insurance.
- 11'x15' Room Under Loft - Our Responsibility
- Currently 2x4 Wall Frame not to code. Vertical spars need to be at most 16" apart. They are further apart than that. Additional spars need to be added, insulation filled in and then the wall covered with plywood and drywall. Can become additional heated/cooled space. Need to make it to spec for insurance.
- Note: As next door neighbor's building is directly adjacent to the West wall of the shop, we are unable to put an A/C out the West wall of the 11'x15' Room Under Loft. Options have been to vent the A/C into the garage area.
- Roof
- Gutter Cleaning - Landlord Responsibility
- Roof Cleaning & Repair (Skylight) - Our Responsibility
- Kitchen
- Installation of 220V - Our Responsibility, Alternative is to use 110 for a hot plate, crock pot, toaster over, microwave, ect.
- Networking - Comcast Responsibility
- Electrical Test - Our Responsibility
- Garbage Area - Our Responsibility. Will be repurposed as needed and loose pieces stored in refurbishable condition for next tenant.
- EnabrinTain: TinkerBuddah mentioned that the outdoor wooden stall, might make a workable painting stall - so we might not want to disassemble this right away.
- Plumbing - Our Responsibility, actions dependent on what we plan to do.
- EnabrinTain: I talked to the Landlord about getting the outdoor spigot reattached. He was amiable, but we'll need to make absolutely sure not to let it freeze in the winter.
- Spacefelix: I just bought a spigot cover for the Brown Street Shop. We can use that for the 5 Points shop and get us through the winter. However, my understanding of its workings is that it retains heat on the spigot that radiates from the building and the spigot itself. However, with an unheated garage, will there still be enough heat from the spigot to keep it warm? Otherwise, can just throw in a 9V battery and a heating element/LED into the spigot cover and let those two keep each other cozy?
- Ventilation - Our Responsibility, actions dependent on what we plan to do.
- Ceiling Fan in Office - Landlord Responsibility
203 Brown St
To Dos for Moving Out
Listed in Order of Priority/Sequence
- Clean Up Shop - Our Responsibility
- Transfer Utilities and Insurance - Our Responsibility
- Pack and transport possessions to new shop - Our Responsibility
- Give Gifts Of Awesomeness to Mike - Our Responsibility
Completed
- Resolve Lease Termination with Mike - Mog & Tim completed this on 4/20/11, Mike will permit us to stay until 5/26/11 at $1000/mo.