== Proposed Organization of Areas ==
+
 
These layouts are to be agreed on at the May 2009 meeting and not altered until the Nov 2009 meeting
+
'''Note:  The information on this page is for archival purposes only.  Makers Local now resides at 414 Stevens Ave, Huntsville, AL 35801.  Please come visit us at the new location!'''
 +
 
 +
== Mailing Address ==
 +
The make shop address is not active with the postmaster.
 +
Snail mail correspondence should be sent to:
 +
 
 +
Makers Local 256 <br>
 +
PO BOX 2234 <br>
 +
Huntsville, AL 35804
 +
 
 +
== Calendar ==
 +
 
 +
== Planned Organization of Areas ==
 +
These layouts were agreed on at the May 2009 meeting and will not be altered until the Nov 2009 meeting.
  
 
=== Lobby with front door ===
 
=== Lobby with front door ===
 
* This will be used like a kitchen.
 
* This will be used like a kitchen.
Proposed:
 
 
* Convert corner closet to a shower
 
* Convert corner closet to a shower
** I think this should be a long term goal --[[User:Jim Shoe|JimShoe]] 10:41, 18 May 2009 (CDT)
+
* The panty will continue being used for servers
*** These aren't meant to be "Finished" in months, just something we'd work towards in the 6 months. --[[User:Brimstone|Brimstone]] 10:45, 18 May 2009 (CDT)
+
* There is no problem with an oven/stove being in the kitchen, but the shop will not buy one.
* Use the pantry as such
+
* Knock out one, if not both, of the windows and replace them with glass/lexan and blinds.
** Where would the servers go then? --[[User:Brimstone|Brimstone]] 09:12, 18 May 2009 (CDT)
+
* Install a electric oven\stove.
+
** I could see us doing a "Make Dinner" night at the shop where we learn how to cook something.  I think there's even a 220 outlet in the lobby.  [[User:Omegix|Omegix]] 10:14, 18 May 2009 (CDT)
+
** There is one. It's on the outside wall next to the pantry --[[User:Brimstone|Brimstone]] 10:24, 18 May 2009 (CDT)
+
* Knock out one if not both of the windows and replace them with glass/lexan and blinds instead. --[[User:Brimstone|Brimstone]] 10:48, 18 May 2009 (CDT)
+
  
 
=== Large common area ===
 
=== Large common area ===
Proposed:
 
 
* Predominant work and learning area. It will remain mostly clear except for 4 large work tables and large active projects in need of space.
 
* Predominant work and learning area. It will remain mostly clear except for 4 large work tables and large active projects in need of space.
* A table dedicated for electronics work. --[[User:Omegix|Omegix]] 15 May 2009 (CDT)
+
* A table dedicated for electronics work.
** Could this be done with an electronics cart that moved to any table/station? --[[User:Brimstone|Brimstone]] 09:17, 18 May 2009 (CDT)
+
* The projector will stay on the media cart.
** I'd like to reduce time spent setting up and breaking down equipment.  The problem at the last shop was having to spend time searching for tools that were not getting put away where they were found, or being put up at all.  I think the further the tools are stored from the work table, the less likely they will get put back.  From experience we can tell that no amount of pleading will correct that.  I really like the idea of the cart for the heavier objects like oscilloscopes or an embedded development machine. When those tools are not in use they take up valuable real estate, even on a dedicated table.  However a cart would be crammed if we tried to fit soldering irons, flux, wire strippers, desoldering equipment, etc.  The best place for these tools is the table itself, in themed drawers or a breadboard pyramid under the table itself.  Strages talked me out of having a breadboard mounted to the back of the table, that would cut off an entire side of real estate for people to work at.  Components (as opposed to tools) such as microprocessors, LEDs, breadboards, etc I see being on the shelves, because they are not frequently accessed. --[[User:Omegix|Omegix]] 09:49, 19 May 2009 (CDT)
+
* A mostly permanent projector and screen/wall used especially for classes/presentation. but could easily display schematics and notes while working
+
** I personally would like to see the projector on the wall with the breaker-boxes similar to how we've been setting up movies --[[User:CrashCart|CrashCart]] 4:23, 18 May 2009 (CDT)
+
  
 
=== Kitchen Loft ===
 
=== Kitchen Loft ===
Proposed:
+
* General chill out space, used for hanging out more so than working on projects.
* General chill out space, used for hanging out more so than working on projects. It is in need of lighting.
+
** Lighting needs work.
** Suggest using the LED bars that we got from Mikes for lighting with dimmer switch. --[[User:Preauxphoto|Preauxphoto]] 11:01, 18 May 2009 (CDT)
+
** Semi-permanent ventilation needs to be installed (box fans or case fans).
* Something to move air, maybe permanent box fans? --[[User:Brimstone|Brimstone]] 09:17, 18 May 2009 (CDT)
+
** Pipe insulation needs to be added to prevent ouchie boo boos.
** How about using some of the 100's of case fans we have putting them on a board and placing them above the sofa? --[[User:Preauxphoto|Preauxphoto]] 11:01, 18 May 2009 (CDT)
+
* A piece of plywood, flat on the floor, attached to the staircase on one side and a 2x4 on the other. This 2x4 holds the bottom edge of the wood from sliding away from the staircase. --[[User:Brimstone|Brimstone]] 10:47, 18 May 2009 (CDT)
+
* Consider further padding of metal ceiling rafters to prevent ouchie-boo-boos.  --[[User:Dickie|Dickie]] 10:48, 18 May 2009 (CDT)
+
** i will provide some "pipe insulation" to prevent "ouchie-boo-boos".--[[User:Preauxphoto|Preauxphoto]] 11:01, 18 May 2009 (CDT)
+
  
 
=== Space next to rollup door ===
 
=== Space next to rollup door ===
Proposed:
 
 
* Tools (in general) will reside here. Wood working and welding will occur in the space in front of the garage door (preferably with it open) or outside.
 
* Tools (in general) will reside here. Wood working and welding will occur in the space in front of the garage door (preferably with it open) or outside.
  
 
=== Storage shelves ===
 
=== Storage shelves ===
Proposed:
 
 
* Arranged with non-electronic supplies to the left and electronics in the middle "devolving" into electronic components to the far right.
 
* Arranged with non-electronic supplies to the left and electronics in the middle "devolving" into electronic components to the far right.
 +
* Wood storage and salvage in left and right near corners respectively.
  
 
=== Storage Loft ===
 
=== Storage Loft ===
Proposed:
+
* Collapsed cardboard box storage area
* Stairs will be built to the immediate right next to the entrance of the storage room for access to the loft. This loft will be our library space containing bookshelves a table in the center and a few chairs. Railing will be installed on this loft same as the one above the kitchen.
+
* Library for learning and reading
** Stairs probably should be built to code. Section 1009 of the IBC-2006[http://bulk.resource.org/codes.gov/al_building.pdf] states that this stairway is 36" wide, with each step no more then 7" tall and 11" deep. This translates out to roughly 13' out for 8' up. If this doesn't fit, then we're looking at also adding a 3' landing and turn, further extending the length of the stairway. --[[User:Brimstone|Brimstone]] 15:22, 18 May 2009 (CDT)
+
** Needs wiring, networking, lighting and a sturdier dumbwaiter.
* Hidden stairs of some sort, like what was at the Burning Nun --[[User:Omegix|Omegix]] 15 May 2009 (CDT)
+
** Put some kind of gymnastics pad in case someone falls off the ladder and to ensure that area is clear for people coming down.
** Maybe attic-style pull down staircase? --[[User:Misterworld|Misterworld]] 15 May 2009 (CDT)
+
* Equipped with books and bookshelves, computer and TV with DVD/VCR
  
=== Unlit room ===
+
=== Equipment Room ===
Proposed:
+
* Storage for items such as the engraver, plotter, computer cart, etc for use either in that room or to be brought out into the main area and returned when not in use.
* Likely be used for storing items such as the engraver, plotter, computer cart, etc for use either in that room or to be brought out into the main area and returned when not in use.
+
* Setup 3 to 4 small personal areas for no more than a weeks use. --[[User:Brimstone|Brimstone]] 09:12, 18 May 2009 (CDT)
+
** Basically just a 4' table and power with a short 4' or 5' wall dividing up each section along one wall.
+
  
 
== Issues with the Landlord ==
 
== Issues with the Landlord ==
 
Point of contact is [[User:Korc|Korc]]
 
Point of contact is [[User:Korc|Korc]]
* Sewage
 
** Fairly high priority, makes fancy things like the toilet not work very well.
 
* Roll up door
 
** The door needs repair on the top and bottom two sections.
 
** It should be openable by a single person for safety reasons.
 
  
 
== Insurance Info ==
 
== Insurance Info ==
Line 69: Line 59:
 
The insurance inspector came by on 5/15 and didn't seem to hate us, we're waiting to hear back.
 
The insurance inspector came by on 5/15 and didn't seem to hate us, we're waiting to hear back.
  
The good news is the items that we have to fix aren’t that hard or time consuming. Also they should be relatively cheap to do.
+
We have insurance at the previous rate. All is well.
 
+
As always if you have time or items that you can donate to bringing the shop to insurable condition they will be greatly appreciated.
+
  
 
== TODO ==
 
== TODO ==
 
Here is a list of the thing that needs to be accomplished:
 
Here is a list of the thing that needs to be accomplished:
 +
# Dead light bulbs need to be replaced and the fixtures cleaned. - [[Facilities_Committee_Page#Shop_Lights_-_Currently_In_Work_-_Will_be_done_3.2F10|DONE 2/10]], --[[User:Spacefelix|Spacefelix]] 16:30, 8 March 2010 (CST)
 +
#* tool area (VERY IMPORTANT, using power tools in the dark is dangerous)
 +
#* paint booth room (fairly important, as there is no other light in this room)
 +
#* main area (mostly adequate for the time being, but flaky lights are annoying to everyone)
 +
#* materials storage room (low priority)
 
# Electrical needs to be refurbished
 
# Electrical needs to be refurbished
 
#* Someone needs to count the outlets so we can get an accurate count of what needs to be replaced.
 
#* Someone needs to count the outlets so we can get an accurate count of what needs to be replaced.
 
#* Make special note of any that have damage at the electrical connection. Those that are cracked or are not in good condition need to be replaced.
 
#* Make special note of any that have damage at the electrical connection. Those that are cracked or are not in good condition need to be replaced.
 
#* The wiring that is NOT run through conduit need to be removed NO EXCEPTIONS.
 
#* The wiring that is NOT run through conduit need to be removed NO EXCEPTIONS.
# Dead light bulbs need to be replaced and the fixtures cleaned.
+
# Storage loft
#* main area
+
#* Stairs or an improved ladder need to be installed
#* tool area
+
#** It would be great if these were built to code, but I'm not sure this is possible with the amount of space we have available.
#* paint booth room
+
# We need to remove the broken tiles and replace the missing tiles in the drop ceiling.
#* materials storage room
+
# find missing items
#Exterior is a “Hazard”
+
#* brimstone's SPA942 linksys sip phone
#*The agent wants to see the grass cut and all the debris removed. Not to mention a good pressure washing of the exterior of the building would go a long way.
+
#* brimstone's box of digium cards and appliances
#*The front left corner between the front door and the roll-up is damaged the agent made the comment that all the major holes like that where insulation is exposed needs to be repaired.
+
#* jimshoe's wgt634u netgear router
#Railing on the storage loft
+
# find ways to conserve energy
#*36" Railing needs to be installed above the storage area.
+
# build [[Shop Table]]s
#Stairs to the storage loft
+
#* We need materials for 1 more table, at least
#*It would be great if these were built to code, but I'm not sure this is possible with the amount of space we have available.
+
# Outside
#Drop ceiling
+
#* Any the major holes where insulation is exposed needs to be repaired. This is more of a maintenance task.
#*We need to replace the missing tiles in the drop ceiling for aesthetics the agent said that it would go a long way with the adjuster.
+
 
#Interior walls
+
===Cooling===
#*The walls need to be scrubbed and/or bleached all the discoloration distracts a lot and would help the adjuster to want to insure us.
+
====Attempts====
 +
* Attempt #1:
 +
** Placing a tray of ice in the air collection chamber of the furnace set to fan only.  The goal being that it would cool the air passing over it and circulate it through the ventilation.
 +
*** No noticeable change in temperature.
 +
* Attempt #2:
 +
** Placing ice water in a styrofoam container with the water pump to circulate cool water through copper tubing placed over the intake vent to the air collection chamber of the furnace.  Blocked the outside intake so it would only pull air from inside the building.
 +
*** No noticeable change in temperature.
 +
* Attempt #3:
 +
** Mounting a 15000 BTU loaned air conditioning unit in the west window.
 +
*** Temperature change localized primarily to a single bench.  No noticeable change in temperature elsewhere.
 +
====Proposed Solutions====
 +
* Proposed Solution #A
 +
**  [http://cgi.ebay.com/Shop-Fan-24%22-High-Velocity-Floor-Warehouse-Commercial_W0QQitemZ320387754830QQcmdZViewItem Shop Fans]
 +
*** Looks like these run around $100. 
 +
**** [[User:Omegix | Omegix]] can throw $30 towards this or a rolly air conditioner
 +
** Roll-Around air conditioned units (like what Tuttle from HC mentioned
 +
*** Where do you find these?
 +
*** How much do they cost?
 +
*** Where is the heat vented?
 +
** Ask landlord to install Air Conditioner
 +
*** At the least lease signing the landlord said he would keep an eye out for an air conditioner.  Impression is that we shouldn't keep our hopes up on someone having a free air conditioner. --[[User:Omegix|Omegix]] 16:23, 1 July 2010 (CDT)
 +
*** Dickie is checking with landlord to see if we can take the value of the air conditioner off the rent, as it would be an item that we left behind when we vacate. --[[User:Omegix|Omegix]] 16:22, 1 July 2010 (CDT)
 +
*** Pending response from landlord, Jeff (and whoever wants to help) will start investigating either how to get an air conditioner donated, or how we can start a fundraiser with an A/C goal. --[[User:Omegix|Omegix]] 16:22, 1 July 2010 (CDT)
 +
 
 +
===Heating===
 +
====Heating Trends====
 +
* When weather was 25 degrees (F) shop took roughly 2 hours to heat to "Comfortable if wearing a coat" (didn't have a thermometer, so subjective measurement it is!).  This was done using the shop's main heater and one space heater.
 +
====Supplemental Heat====
 +
* There is currently 1 space heater in the shop [[User:Omegix|Omegix]] 23:10, 12 January 2010 (CST)
 +
* Omegix has two additional space "hefty" space heaters he can bring to the shop, but they take about 2 hours to ramp up. Additional space heaters of course means a higher utility bill, may be worth attaching a kill-a-wat to them to determine cost per hour.
 +
* Omegix has one additional "light" space heater at the shop, can keep one additional person's hands or feet warm
 +
 
 +
[[Category:Archives]]

Latest revision as of 15:53, 23 August 2011

Note: The information on this page is for archival purposes only. Makers Local now resides at 414 Stevens Ave, Huntsville, AL 35801. Please come visit us at the new location!

Mailing Address

The make shop address is not active with the postmaster. Snail mail correspondence should be sent to:

Makers Local 256
PO BOX 2234
Huntsville, AL 35804

Calendar

Planned Organization of Areas

These layouts were agreed on at the May 2009 meeting and will not be altered until the Nov 2009 meeting.

Lobby with front door

  • This will be used like a kitchen.
  • Convert corner closet to a shower
  • The panty will continue being used for servers
  • There is no problem with an oven/stove being in the kitchen, but the shop will not buy one.
  • Knock out one, if not both, of the windows and replace them with glass/lexan and blinds.

Large common area

  • Predominant work and learning area. It will remain mostly clear except for 4 large work tables and large active projects in need of space.
  • A table dedicated for electronics work.
  • The projector will stay on the media cart.

Kitchen Loft

  • General chill out space, used for hanging out more so than working on projects.
    • Lighting needs work.
    • Semi-permanent ventilation needs to be installed (box fans or case fans).
    • Pipe insulation needs to be added to prevent ouchie boo boos.

Space next to rollup door

  • Tools (in general) will reside here. Wood working and welding will occur in the space in front of the garage door (preferably with it open) or outside.

Storage shelves

  • Arranged with non-electronic supplies to the left and electronics in the middle "devolving" into electronic components to the far right.
  • Wood storage and salvage in left and right near corners respectively.

Storage Loft

  • Collapsed cardboard box storage area
  • Library for learning and reading
    • Needs wiring, networking, lighting and a sturdier dumbwaiter.
    • Put some kind of gymnastics pad in case someone falls off the ladder and to ensure that area is clear for people coming down.
  • Equipped with books and bookshelves, computer and TV with DVD/VCR

Equipment Room

  • Storage for items such as the engraver, plotter, computer cart, etc for use either in that room or to be brought out into the main area and returned when not in use.

Issues with the Landlord

Point of contact is Korc

Insurance Info

The meeting with the insurance agent 23 April 2009 didn’t go as well as planned. He doesn’t seem to share the same enthusiasm for the new shop as all of us do.

The insurance inspector came by on 5/15 and didn't seem to hate us, we're waiting to hear back.

We have insurance at the previous rate. All is well.

TODO

Here is a list of the thing that needs to be accomplished:

  1. Dead light bulbs need to be replaced and the fixtures cleaned. - DONE 2/10, --Spacefelix 16:30, 8 March 2010 (CST)
    • tool area (VERY IMPORTANT, using power tools in the dark is dangerous)
    • paint booth room (fairly important, as there is no other light in this room)
    • main area (mostly adequate for the time being, but flaky lights are annoying to everyone)
    • materials storage room (low priority)
  2. Electrical needs to be refurbished
    • Someone needs to count the outlets so we can get an accurate count of what needs to be replaced.
    • Make special note of any that have damage at the electrical connection. Those that are cracked or are not in good condition need to be replaced.
    • The wiring that is NOT run through conduit need to be removed NO EXCEPTIONS.
  3. Storage loft
    • Stairs or an improved ladder need to be installed
      • It would be great if these were built to code, but I'm not sure this is possible with the amount of space we have available.
  4. We need to remove the broken tiles and replace the missing tiles in the drop ceiling.
  5. find missing items
    • brimstone's SPA942 linksys sip phone
    • brimstone's box of digium cards and appliances
    • jimshoe's wgt634u netgear router
  6. find ways to conserve energy
  7. build Shop Tables
    • We need materials for 1 more table, at least
  8. Outside
    • Any the major holes where insulation is exposed needs to be repaired. This is more of a maintenance task.

Cooling

Attempts

  • Attempt #1:
    • Placing a tray of ice in the air collection chamber of the furnace set to fan only. The goal being that it would cool the air passing over it and circulate it through the ventilation.
      • No noticeable change in temperature.
  • Attempt #2:
    • Placing ice water in a styrofoam container with the water pump to circulate cool water through copper tubing placed over the intake vent to the air collection chamber of the furnace. Blocked the outside intake so it would only pull air from inside the building.
      • No noticeable change in temperature.
  • Attempt #3:
    • Mounting a 15000 BTU loaned air conditioning unit in the west window.
      • Temperature change localized primarily to a single bench. No noticeable change in temperature elsewhere.

Proposed Solutions

  • Proposed Solution #A
    • Shop Fans
      • Looks like these run around $100.
        • Omegix can throw $30 towards this or a rolly air conditioner
    • Roll-Around air conditioned units (like what Tuttle from HC mentioned
      • Where do you find these?
      • How much do they cost?
      • Where is the heat vented?
    • Ask landlord to install Air Conditioner
      • At the least lease signing the landlord said he would keep an eye out for an air conditioner. Impression is that we shouldn't keep our hopes up on someone having a free air conditioner. --Omegix 16:23, 1 July 2010 (CDT)
      • Dickie is checking with landlord to see if we can take the value of the air conditioner off the rent, as it would be an item that we left behind when we vacate. --Omegix 16:22, 1 July 2010 (CDT)
      • Pending response from landlord, Jeff (and whoever wants to help) will start investigating either how to get an air conditioner donated, or how we can start a fundraiser with an A/C goal. --Omegix 16:22, 1 July 2010 (CDT)

Heating

Heating Trends

  • When weather was 25 degrees (F) shop took roughly 2 hours to heat to "Comfortable if wearing a coat" (didn't have a thermometer, so subjective measurement it is!). This was done using the shop's main heater and one space heater.

Supplemental Heat

  • There is currently 1 space heater in the shop Omegix 23:10, 12 January 2010 (CST)
  • Omegix has two additional space "hefty" space heaters he can bring to the shop, but they take about 2 hours to ramp up. Additional space heaters of course means a higher utility bill, may be worth attaching a kill-a-wat to them to determine cost per hour.
  • Omegix has one additional "light" space heater at the shop, can keep one additional person's hands or feet warm