m (The To Do List: new item)
(The Critical List: added billing records organization to action item list)
Line 9: Line 9:
 
|-
 
|-
 
| Move finances over to GNU Cach || Jeff || TBD || June Meeting
 
| Move finances over to GNU Cach || Jeff || TBD || June Meeting
 +
|-
 +
| Need to separate 2008 Billing records from 2009 Billing Records || Jeff || Something goes here ||July Meeting
 
|-
 
|-
 
| Have powerbolt metal keys cut for board memebers || Jeff || Completed || May 2, 2009
 
| Have powerbolt metal keys cut for board memebers || Jeff || Completed || May 2, 2009

Revision as of 14:01, 27 May 2009

The Critical List

On this list exist items that are essential to the operation of the Make Shop.

Item Owner Status ETA
Get AL lawyer to audit form for AL caveats Mog To get response next week May Meeting
Schedule a time for a power tools class Bob TBD May Meeting
Move finances over to GNU Cach Jeff TBD June Meeting
Need to separate 2008 Billing records from 2009 Billing Records Jeff Something goes here July Meeting
Have powerbolt metal keys cut for board memebers Jeff Completed May 2, 2009
Revisit pledging members contributions and Board members' lessening contributions Everyone TBD Jan 2010
Submit Form 990-N to IRS (assuming Makers Local is not grossing $25k) Treasurer Yearly April 2010

The To Do List

  • TOP PRIORITY: make sure Maintenance is taken care of
  • get slow building drain fixed: the plumber was back on 5/6, this may be a problem with a mains blockage
  • Makerslocal sign
    • fix frame
    • seal sign
    • mount sign out front
  • front door
    • paint trim
    • develop USB authentication hardware -Omegix and Ratmandu meeting on this soon
  • unpack boxes
  • find missing items
    • brimstone's SPA942 linksys sip phone
    • brimstone's box of digium cards and appliances
    • jimshoe's wgt634u netgear router
  • build Shop Tables
    • get materials for more
  • mount XM radio antenna outside on a pole
  • find an appropriate place to mount the dart board and do so
  • find ways to conserve energy
  • finalize design/location of electronics bench