* Began repairs of office bathroom's toilet.
** Toilet flange is damaged, needs repair/replacement before proceeding.
|| ~~~~
Task |
Signed Off By
|
- Repaired the hallway-shop door frame and painted the door.
|
Ctag (talk) 12:59, 27 March 2017 (CDT)
and Travis
|
- Installed new 4ft LED bulbs (6000K) from Travis with help from Ctag
|
Kinsey 18:00, 31 January 2017 (CST)
|
|
Travis 12:00, 30 January 2017 (CST)
|
- Added month/week facilities maintenance checklists
|
Ctag (talk) 00:03, 18 January 2017 (CST)
|
- 4x Opticron's LED 8-ft fluorescent tube replacements installed. Shop is BRIGHT.
|
Ctag (talk) 21:54, 14 December 2016 (CST)
|
- Cleaned A/C Filter for Office A/C
- Attendance: Phil Showers.
|
Phil 23:00, 11 September 2016 (CDT)
|
- Installed unitstrut mount points for HAM radio mast.
- Attendance: Jeff Cotton, Travis Crumpton.
|
Ctag (talk) 13:00, 11 September 2016 (CDT)
|
- Installed protective screen on the FabLab AC unit.
|
Ctag (talk) 12:55, 11 September 2016 (CDT)
|
- Installed automatic bilge pump for Fablab AC
|
Ctag (talk) 23:51, 3 August 2016 (CDT)
|
- Drilled drain hole on the FabLab AC unit.
- Currently no auto removal, just drains into a bucket.
|
Ctag (talk) 17:02, 1 August 2016 (CDT)
|
- Travis hanged pegboard around the upstairs handrail.
- Also installed strages' new projector screen.
|
Ctag (talk) 16:09, 1 August 2016 (CDT)
|
- Hallway door has a spring-loaded hinge such that it now auto-closes. Installed two weeks ago.
|
Ctag (talk) 12:44, 21 July 2016 (CDT)
|
- Hallway bathroom renovation is completed for several days now, no new leaks found.
|
Ctag (talk) 12:40, 21 July 2016 (CDT)
|
- The last ever clean up day was yesterday.
- Automotive shelving cleaned.
- 2 dumpsters of material removed from shop.
- Traction tape put on stairs.
- Kitchen and bathroom renovation kickstarted.
|
Ctag (talk) 16:12, 22 May 2016 (CDT)
|
- Poured new concrete for office bathroom flange.
|
Ctag (talk) 16:06, 19 May 2016 (CDT)
|
- Replaced the AA battery in the office's analog wall clock.
|
Ctag (talk) 16:50, 18 May 2016 (CDT)
|
- Began repairs of office bathroom's toilet.
- Images
- Toilet flange is damaged, needs repair/replacement before proceeding.
|
Ctag (talk) 15:24, 18 May 2016 (CDT)
|