This page is a more general and verbose listing of Facilities operations. It include sub-tasks for larger projects and routine cleaning and upkeep.

Formatting (add to top of table):

|-
|
* Began repairs of office bathroom's toilet. 
** Toilet flange is damaged, needs repair/replacement before proceeding.
|| ~~~~


Task Signed Off By
  • Repaired the hallway-shop door frame and painted the door.
Ctag (talk) 12:59, 27 March 2017 (CDT)

and Travis

  • Installed new 4ft LED bulbs (6000K) from Travis with help from Ctag
Kinsey 18:00, 31 January 2017 (CST)
  • Replaced upstairs sink
Travis 12:00, 30 January 2017 (CST)
Ctag (talk) 00:03, 18 January 2017 (CST)
  • 4x Opticron's LED 8-ft fluorescent tube replacements installed. Shop is BRIGHT.
Ctag (talk) 21:54, 14 December 2016 (CST)
  • Cleaned A/C Filter for Office A/C
    • Attendance: Phil Showers.
Phil 23:00, 11 September 2016 (CDT)
  • Installed unitstrut mount points for HAM radio mast.
    • Attendance: Jeff Cotton, Travis Crumpton.
Ctag (talk) 13:00, 11 September 2016 (CDT)
  • Installed protective screen on the FabLab AC unit.
Ctag (talk) 12:55, 11 September 2016 (CDT)
Ctag (talk) 23:51, 3 August 2016 (CDT)
  • Drilled drain hole on the FabLab AC unit.
    • Currently no auto removal, just drains into a bucket.
Ctag (talk) 17:02, 1 August 2016 (CDT)
  • Travis hanged pegboard around the upstairs handrail.
  • Also installed strages' new projector screen.
Ctag (talk) 16:09, 1 August 2016 (CDT)
  • Hallway door has a spring-loaded hinge such that it now auto-closes. Installed two weeks ago.
Ctag (talk) 12:44, 21 July 2016 (CDT)
  • Hallway bathroom renovation is completed for several days now, no new leaks found.
Ctag (talk) 12:40, 21 July 2016 (CDT)
  • The last ever clean up day was yesterday.
    • Automotive shelving cleaned.
    • 2 dumpsters of material removed from shop.
    • Traction tape put on stairs.
    • Kitchen and bathroom renovation kickstarted.
Ctag (talk) 16:12, 22 May 2016 (CDT)
  • Poured new concrete for office bathroom flange.
Ctag (talk) 16:06, 19 May 2016 (CDT)
  • Replaced the AA battery in the office's analog wall clock.
Ctag (talk) 16:50, 18 May 2016 (CDT)
  • Began repairs of office bathroom's toilet.
    • Images
    • Toilet flange is damaged, needs repair/replacement before proceeding.
Ctag (talk) 15:24, 18 May 2016 (CDT)