Facilities

From Makers Local 256
Jump to: navigation, search

Creator:
ctag
Status:
Not on fire
Born On:
17:17, 16 May 2016 (CDT)
Last Updated:
23:34, 25 January 2017 (CDT)

The Makers Local Facilities Director and Committee work to keep the make shop a clean and safe environment. These pages exist to help the committee and general membership organize the upkeep of the shop, as well as provide information, training, and updates to the membership.

If you need to contact the Facilities Committee, please email facilities@makerslocal.org.

Facilities Committee Members
Workplace Safety

Facility News

Date Event
2009/09/?? Equipment requests and acquisitions set up.
2009/07/?? Shop signage installed.
2009/04/?? New shop building acquired. 203 Brown St.
2011/11/?? Oven Installed
2010/04/?? 220V will be needed for stove, Ratmandu can help. For now, 110V will work for basic appliances; pizza oven, microwave, etc.



Maintenance

Task Signed Off By
  • Repaired the hallway-shop door frame and painted the door.
Ctag (talk) 12:59, 27 March 2017 (CDT)

and Travis

  • Installed new 4ft LED bulbs (6000K) from Travis with help from Ctag
Kinsey 18:00, 31 January 2017 (CST)
  • Replaced upstairs sink
Travis 12:00, 30 January 2017 (CST)
Ctag (talk) 00:03, 18 January 2017 (CST)
  • 4x Opticron's LED 8-ft fluorescent tube replacements installed. Shop is BRIGHT.
Ctag (talk) 21:54, 14 December 2016 (CST)
  • Cleaned A/C Filter for Office A/C
    • Attendance: Phil Showers.
Phil 23:00, 11 September 2016 (CDT)
  • Installed unitstrut mount points for HAM radio mast.
    • Attendance: Jeff Cotton, Travis Crumpton.
Ctag (talk) 13:00, 11 September 2016 (CDT)
  • Installed protective screen on the FabLab AC unit.
Ctag (talk) 12:55, 11 September 2016 (CDT)
Ctag (talk) 23:51, 3 August 2016 (CDT)
  • Drilled drain hole on the FabLab AC unit.
    • Currently no auto removal, just drains into a bucket.
Ctag (talk) 17:02, 1 August 2016 (CDT)
  • Travis hanged pegboard around the upstairs handrail.
  • Also installed strages' new projector screen.
Ctag (talk) 16:09, 1 August 2016 (CDT)
  • Hallway door has a spring-loaded hinge such that it now auto-closes. Installed two weeks ago.
Ctag (talk) 12:44, 21 July 2016 (CDT)
  • Hallway bathroom renovation is completed for several days now, no new leaks found.
Ctag (talk) 12:40, 21 July 2016 (CDT)
  • The last ever clean up day was yesterday.
    • Automotive shelving cleaned.
    • 2 dumpsters of material removed from shop.
    • Traction tape put on stairs.
    • Kitchen and bathroom renovation kickstarted.
Ctag (talk) 16:12, 22 May 2016 (CDT)
  • Poured new concrete for office bathroom flange.
Ctag (talk) 16:06, 19 May 2016 (CDT)
  • Replaced the AA battery in the office's analog wall clock.
Ctag (talk) 16:50, 18 May 2016 (CDT)
  • Began repairs of office bathroom's toilet.
    • Images
    • Toilet flange is damaged, needs repair/replacement before proceeding.
Ctag (talk) 15:24, 18 May 2016 (CDT)



Subpages

All subpages of this one are automatically listed here. To aid in organization, also check that every subpage has [[Category:Facilities]] listed near the bottom.

All Facility Wiki Pages
Facilities/414 Stevens AveFacilities/Circuit BreakerFacilities/Committee
Facilities/Committee/MembersFacilities/DirectorFacilities/Equipment And Material Requests
Facilities/HVACFacilities/Lost And FoundFacilities/Maintenance Log
Facilities/New MembersFacilities/NewsFacilities/Notes
Facilities/Power ConsumptionFacilities/Priority ListFacilities/Priority List/Textiles Migration
Facilities/SafetyFacilities/TablesFacilities/Task Checklist
Facilities/Task Checklist BiannualFacilities/Task Checklist MonthFacilities/Task Checklist Week
Facilities/Waste