Doing

To Do

  • ELECTRICAL
    • Tools area breakers
    • AV area wiring clusterfuck
    • Outlets that need attention
      • Kitchen switch and outlet
      • Hallway bathroom
      • Office bathroom
      • Front door
  • PNEUMATIC
    • Replace leaking hose above 2nd floor CNC Machine
    • Get on-demand ventilation for 3-D printers


  • Set up consumables tracking.
    • Item "Stock" for shop?
    • Items that should always be available (soap, duct tape) are voted on by the membership, and then facilities committee works to keep them in stock.
  • UPGRAYEDS
    • Install water heater timer
    • Drywall (+ artwork) around upstairs banister
    • Replace bikeshed
    • opening office window.
  • FIRST AID
    • [doing] Move main first aid kit out of bathroom.
    • Provide floorplan of safety equipment
    • Provide on-demand lectures for first aid.
  • Shop tours? Field trips?
    • The shop -- as a nonprofit with the stated goal of spreading the maker spirit -- should be an amazing place for school field trips. Currently I actively avoid them, because there's no way to guarantee that the kids don't encounter a drunk member in the shop. Fixing the problem then censors members in the name of making the shop kid-friendly, which it isn't.
    • I think a solution to this dilemma would be to schedule field trips, and then alert the shop that there will be a dry day when no alcohol consumption or obscenity will be tolerated.

Done

  • Renovate bathroom
    • New linoleum floor
    • CNC new sink cabinet
    • Better fan? Connect fan to outside exhaust?
  • UNISTRUT
    • Install Unistrut for Radio Mast Mount \ Camera Mount
    • To be installed either on the corner of the building, or if that is not feasable, behind member storage.
    • Ctag and Omegix to install on 2016.05.21 (Cleanup Day)
  • FABLAB
    • Finish installing ceiling.
    • Install shelving.
    • [done] fablab AC
      • Thanks Travis!
  • Organize lost and found
    • Four shelves. Four weeks.
      • Three weeks to collect item.
      • fourth week anyone can take it.
      • End of the fourth week item is tossed.
    • All incoming/outgoing items are cataloged.

Bathroom Renovation

Dimensions

Environment:

  • Bathroom floor
    • 6' x 5'
  • Horizontal Trim
    • 36 & 1/4" from floor

Old Vanity:

  • Existing Vanity
    • front: 24" x 30"
  • Footwell
    • 4" x 4"

New Vanity:

  • Plywood
    • 5/16" thick
  • New Countertop
    • 28" x 25" (w x d)
    • 5" tall at rear panel
    • 1&1/2" tall at front lip
    • 3/4" thick at middle section
  • New Vanity Frame
    • (36.25 - 5) = 31.25" tall
    • 27.5" wide
    • 23.5" deep
  • Footwell
    • 4" x 4"

Supplies

  • [HAVE - Norm] Countertop
  • Floor Tiles ($0.69 per ft^2)
  • Adhesive ($13.47 per gallon)
  • Rubber Trim ($69.97)
    • 4" tall, 120' long
  • Glue for Trim ($4.97)
    • Probably need two
  • Sealer ($15.87 per gallon)
  • High Efficiency Toilet ($100)
  • Wall Paint ($???)
  • Drywall ($12)

Estimated Total Cost: $243