Difference between revisions of "Facilities/Maintenance Log"

From Makers Local 256
Jump to: navigation, search
m (wall clock battery)
(new flange progress)
Line 17: Line 17:
 
New table entries (based on the snippet above) go on a new line
 
New table entries (based on the snippet above) go on a new line
 
directly below this one. -->
 
directly below this one. -->
 +
|-
 +
|
 +
* Poured new concrete for office bathroom flange.
 +
|| [[User:Ctag|Ctag]] ([[User talk:Ctag|talk]]) 16:06, 19 May 2016 (CDT)
 
|-
 
|-
 
|
 
|

Revision as of 16:06, 19 May 2016

This page is a more general and verbose listing of Facilities operations. It include sub-tasks for larger projects and routine cleaning and upkeep.

Formatting (add to top of table):

|-
|
* Began repairs of office bathroom's toilet. 
** Toilet flange is damaged, needs repair/replacement before proceeding.
|| ~~~~


Task Signed Off By
  • Poured new concrete for office bathroom flange.
Ctag (talk) 16:06, 19 May 2016 (CDT)
  • Replaced the AA battery in the office's analog wall clock.
Ctag (talk) 16:50, 18 May 2016 (CDT)
  • Began repairs of office bathroom's toilet.
    • Images
    • Toilet flange is damaged, needs repair/replacement before proceeding.
Ctag (talk) 15:24, 18 May 2016 (CDT)