Difference between revisions of "Facilities/Maintenance Log"
From Makers Local 256
(fablab AC drain) |
(Updated table comment and added repaired door hinges to list.) |
||
(9 intermediate revisions by 4 users not shown) | |||
Line 11: | Line 11: | ||
<!-- |style="background: #ccc; font-weight: bold; font-size: 14px; padding: 5px;"|[[Facilities/News|Facility News]] --> | <!-- |style="background: #ccc; font-weight: bold; font-size: 14px; padding: 5px;"|[[Facilities/News|Facility News]] --> | ||
− | <onlyinclude | + | <onlyinclude> |
{| class="wikitable sortable" | {| class="wikitable sortable" | ||
|- | |- | ||
! Task !! Signed Off By <!-- | ! Task !! Signed Off By <!-- | ||
+ | ================================================================ | ||
New table entries (based on the snippet above) go on a new line | New table entries (based on the snippet above) go on a new line | ||
− | directly below this | + | directly below this comment. |
+ | =============================================================--> | ||
+ | |- | ||
+ | | | ||
+ | * Repaired the hallway-shop door frame and painted the door. | ||
+ | || [[User:Ctag|Ctag]] ([[User talk:Ctag|talk]]) 12:59, 27 March 2017 (CDT) | ||
+ | and Travis | ||
+ | |- | ||
+ | | | ||
+ | * Installed new 4ft LED bulbs (6000K) from [[User:Traza|Travis]] with help from [[User:Ctag|Ctag]] | ||
+ | || [[User:Opticron|Kinsey]] 18:00, 31 January 2017 (CST) | ||
+ | |- | ||
+ | | | ||
+ | * Replaced upstairs sink | ||
+ | || [[User:Traza|Travis]] 12:00, 30 January 2017 (CST) | ||
+ | |- | ||
+ | | | ||
+ | * Added month/week facilities maintenance checklists | ||
+ | ** http://imgur.com/a/zi5lV | ||
+ | || [[User:Ctag|Ctag]] ([[User talk:Ctag|talk]]) 00:03, 18 January 2017 (CST) | ||
+ | |- | ||
+ | | | ||
+ | * 4x Opticron's LED 8-ft fluorescent tube replacements installed. Shop is BRIGHT. | ||
+ | || [[User:Ctag|Ctag]] ([[User talk:Ctag|talk]]) 21:54, 14 December 2016 (CST) | ||
+ | |- | ||
+ | | | ||
+ | * Cleaned A/C Filter for Office A/C | ||
+ | ** Attendance: Phil Showers. | ||
+ | || [[User:Enabrintain|Phil]] 23:00, 11 September 2016 (CDT) | ||
+ | |- | ||
+ | | | ||
+ | * Installed unitstrut mount points for HAM radio mast. | ||
+ | ** Attendance: Jeff Cotton, Travis Crumpton. | ||
+ | || [[User:Ctag|Ctag]] ([[User talk:Ctag|talk]]) 13:00, 11 September 2016 (CDT) | ||
+ | |- | ||
+ | | | ||
+ | * Installed protective screen on the FabLab AC unit. | ||
+ | || [[User:Ctag|Ctag]] ([[User talk:Ctag|talk]]) 12:55, 11 September 2016 (CDT) | ||
+ | |- | ||
+ | | | ||
+ | * Installed automatic bilge pump for Fablab AC | ||
+ | ** [http://imgur.com/a/Jv9kO http://imgur.com/a/Jv9kO] | ||
+ | || [[User:Ctag|Ctag]] ([[User talk:Ctag|talk]]) 23:51, 3 August 2016 (CDT) | ||
|- | |- | ||
| | | |
Latest revision as of 12:59, 27 March 2017
This page is a more general and verbose listing of Facilities operations. It include sub-tasks for larger projects and routine cleaning and upkeep.
Formatting (add to top of table):
|- | * Began repairs of office bathroom's toilet. ** Toilet flange is damaged, needs repair/replacement before proceeding. || ~~~~
Task | Signed Off By |
---|---|
|
Ctag (talk) 12:59, 27 March 2017 (CDT)
and Travis |
Kinsey 18:00, 31 January 2017 (CST) | |
|
Travis 12:00, 30 January 2017 (CST) |
|
Ctag (talk) 00:03, 18 January 2017 (CST) |
|
Ctag (talk) 21:54, 14 December 2016 (CST) |
|
Phil 23:00, 11 September 2016 (CDT) |
|
Ctag (talk) 13:00, 11 September 2016 (CDT) |
|
Ctag (talk) 12:55, 11 September 2016 (CDT) |
|
Ctag (talk) 23:51, 3 August 2016 (CDT) |
|
Ctag (talk) 17:02, 1 August 2016 (CDT) |
|
Ctag (talk) 16:09, 1 August 2016 (CDT) |
|
Ctag (talk) 12:44, 21 July 2016 (CDT) |
|
Ctag (talk) 12:40, 21 July 2016 (CDT) |
|
Ctag (talk) 16:12, 22 May 2016 (CDT) |
|
Ctag (talk) 16:06, 19 May 2016 (CDT) |
|
Ctag (talk) 16:50, 18 May 2016 (CDT) |
|
Ctag (talk) 15:24, 18 May 2016 (CDT) |