* Bathroom
+
* Bathroom floor
 
** 6' x 5'
 
** 6' x 5'
* Countertop
+
* New Countertop
 
** 28" x 25" (w x d)
 
** 28" x 25" (w x d)
* Vanity
+
* New Vanity
 
** 27.5" x 24.25" (w x d)
 
** 27.5" x 24.25" (w x d)
 +
* Existing Vanity
 +
** front: 24" x 30"
 +
** 21" deep
 +
  
 
==== Supplies ====
 
==== Supplies ====

Revision as of 18:00, 18 May 2016

Staging

Bathroom Renovation

Dimensions

  • Bathroom floor
    • 6' x 5'
  • New Countertop
    • 28" x 25" (w x d)
  • New Vanity
    • 27.5" x 24.25" (w x d)
  • Existing Vanity
    • front: 24" x 30"
    • 21" deep


Supplies

  • [HAVE - Norm] Countertop
  • Floor Tiles ($0.69 per ft^2)
  • Adhesive ($13.47 per gallon)
  • Rubber Trim ($69.97)
    • 4" tall, 120' long
  • Glue for Trim ($4.97)
    • Probably need two
  • Sealer ($15.87 per gallon)
  • High Efficiency Toilet ($100)
  • Wall Paint ($???)
  • Drywall ($12)

Estimated Total Cost: $243

Stair Treads

Shop has 13 stairs. Need 13 treads.

Stairs are 32" x 9"

A pack of 12 traction tape pieces is on the way.

Tasklist

  • MEGADOOR
    • New exterior usb port on door.
    • usb/nfc auth on back door.
    • Fix front door wiring
  • Set up consumables tracking.
    • Item "Stock" for shop?
    • Items that should always be available (soap, duct tape) are voted on by the membership, and then facilities committee works to keep them in stock.
  • VENDING
    • LED matrix in soda machine
    • other vending machine Qt interface
    • Other vending machine item supply
  • UPGRAYEDS
    • Install water heater timer
    • [doing] Renovate bathroom
      • New linoleum floor
      • CNC new sink cabinet
      • Better fan? Connect fan to outside exhaust?
  • Drywall (+ artwork) around upstairs banister
  • Replace bikeshed
  • Ceiling fan blades in office.
  • FABLAB
    • Finish installing ceiling.
    • Install shelving.
    • [done] fablab AC
      • Thanks Travis!
  • [doing] Organize lost and found
    • Four shelves. Four weeks.
      • Three weeks to collect item.
      • fourth week anyone can take it.
      • End of the fourth week item is tossed.
    • All incoming/outgoing items are cataloged.
  • FIRST AID
    • [doing] Move main first aid kit out of bathroom.
    • Provide floorplan of safety equipment
    • Provide on-demand lectures for first aid.
  • Shop tours? Field trips?
    • The shop -- as a nonprofit with the stated goal of spreading the maker spirit -- should be an amazing place for school field trips. Currently I actively avoid them, because there's no way to guarantee that the kids don't encounter a drunk member in the shop. Fixing the problem then censors members in the name of making the shop kid-friendly, which it isn't.
    • I think a solution to this dilemma would be to schedule field trips, and then alert the shop that there will be a dry day when no alcohol consumption or obscenity will be tolerated.
  • BIKESHED
    • Bikeshedding
      • Shasta?
    • Bikeshed