Difference between revisions of "Facilities/Priority List"
From Makers Local 256
m (→Dimensions: more measurements) |
m (→Dimensions: more measurements) |
||
Line 23: | Line 23: | ||
** 1&1/2" tall at front lip | ** 1&1/2" tall at front lip | ||
** 3/4" thick at middle section | ** 3/4" thick at middle section | ||
− | * New Vanity | + | * New Vanity Frame |
− | ** 27.5" | + | ** (36.25 - 5) = 31.25" tall |
+ | ** 27.5" wide | ||
+ | ** 23.5" deep | ||
+ | * Footwell | ||
+ | ** 4" x 4" | ||
==== Supplies ==== | ==== Supplies ==== |
Revision as of 00:08, 20 May 2016
Contents
[hide]Staging
Bathroom Renovation
Dimensions
Environment:
- Bathroom floor
- 6' x 5'
- Horizontal Trim
- 36 & 1/4" from floor
Old Vanity:
- Existing Vanity
- front: 24" x 30"
- Footwell
- 4" x 4"
New Vanity:
- New Countertop
- 28" x 25" (w x d)
- 5" tall at rear panel
- 1&1/2" tall at front lip
- 3/4" thick at middle section
- New Vanity Frame
- (36.25 - 5) = 31.25" tall
- 27.5" wide
- 23.5" deep
- Footwell
- 4" x 4"
Supplies
- [HAVE - Norm] Countertop
- Floor Tiles ($0.69 per ft^2)
- Adhesive ($13.47 per gallon)
- Rubber Trim ($69.97)
- 4" tall, 120' long
- Glue for Trim ($4.97)
- Probably need two
- Sealer ($15.87 per gallon)
- High Efficiency Toilet ($100)
- Wall Paint ($???)
- Drywall ($12)
Estimated Total Cost: $243
Stair Treads
Shop has 13 stairs. Need 13 treads.
Stairs are 32" x 9"
A pack of 12 traction tape pieces is on the way.
Tasklist
- UNISTRUT
- Install Unistrut for Radio Mast Mount \ Camera Mount
- To be installed either on the corner of the building, or if that is not feasable, behind member storage.
- Ctag and Omegix to install on 2016.05.21 (Cleanup Day)
- MEGADOOR
- New exterior usb port on door.
- usb/nfc auth on back door.
- Fix front door wiring
- Set up consumables tracking.
- Item "Stock" for shop?
- Items that should always be available (soap, duct tape) are voted on by the membership, and then facilities committee works to keep them in stock.
- VENDING
- LED matrix in soda machine
- other vending machine Qt interface
- Other vending machine item supply
- UPGRAYEDS
- Install water heater timer
- [doing] Renovate bathroom
- New linoleum floor
- CNC new sink cabinet
- Better fan? Connect fan to outside exhaust?
- Drywall (+ artwork) around upstairs banister
- Replace bikeshed
- Ceiling fan blades in office.
- Traction tape on stairs.
- opening office window.
- FABLAB
- Finish installing ceiling.
- Install shelving.
- [done] fablab AC
- Thanks Travis!
- [done] Organize lost and found
- Four shelves. Four weeks.
- Three weeks to collect item.
- fourth week anyone can take it.
- End of the fourth week item is tossed.
- All incoming/outgoing items are cataloged.
- Four shelves. Four weeks.
- FIRST AID
- [doing] Move main first aid kit out of bathroom.
- Provide floorplan of safety equipment
- Provide on-demand lectures for first aid.
- Shop tours? Field trips?
- The shop -- as a nonprofit with the stated goal of spreading the maker spirit -- should be an amazing place for school field trips. Currently I actively avoid them, because there's no way to guarantee that the kids don't encounter a drunk member in the shop. Fixing the problem then censors members in the name of making the shop kid-friendly, which it isn't.
- I think a solution to this dilemma would be to schedule field trips, and then alert the shop that there will be a dry day when no alcohol consumption or obscenity will be tolerated.
- BIKESHED
- Bikeshedding
- Shasta?
- Bikeshed
- Bikeshedding