Facilities/Maintenance Log

From Makers Local 256
< Facilities
Revision as of 23:51, 3 August 2016 by Ctag (Talk | contribs)

Jump to: navigation, search

This page is a more general and verbose listing of Facilities operations. It include sub-tasks for larger projects and routine cleaning and upkeep.

Formatting (add to top of table):

|-
|
* Began repairs of office bathroom's toilet. 
** Toilet flange is damaged, needs repair/replacement before proceeding.
|| ~~~~


Task Signed Off By
  • Installed automatic bilge pump for Fablab AC
Ctag (talk) 23:51, 3 August 2016 (CDT)
  • Drilled drain hole on the FabLab AC unit.
    • Currently no auto removal, just drains into a bucket.
Ctag (talk) 17:02, 1 August 2016 (CDT)
  • Travis hanged pegboard around the upstairs handrail.
  • Also installed strages' new projector screen.
Ctag (talk) 16:09, 1 August 2016 (CDT)
  • Hallway door has a spring-loaded hinge such that it now auto-closes. Installed two weeks ago.
Ctag (talk) 12:44, 21 July 2016 (CDT)
  • Hallway bathroom renovation is completed for several days now, no new leaks found.
Ctag (talk) 12:40, 21 July 2016 (CDT)
  • The last ever clean up day was yesterday.
    • Automotive shelving cleaned.
    • 2 dumpsters of material removed from shop.
    • Traction tape put on stairs.
    • Kitchen and bathroom renovation kickstarted.
Ctag (talk) 16:12, 22 May 2016 (CDT)
  • Poured new concrete for office bathroom flange.
Ctag (talk) 16:06, 19 May 2016 (CDT)
  • Replaced the AA battery in the office's analog wall clock.
Ctag (talk) 16:50, 18 May 2016 (CDT)
  • Began repairs of office bathroom's toilet.
    • Images
    • Toilet flange is damaged, needs repair/replacement before proceeding.
Ctag (talk) 15:24, 18 May 2016 (CDT)