== Doing ==
  
# Assist [[We_Need_to_Move|Move to 414 Stevens Ave]] and with shop [[We_Need_to_Move#To_Dos_for_an_Operational_.26_Insurable_Shop|To Dos]].
+
== To Do ==
# Shop Safety
+
 
## Mount additional fire extinguishers (Per [[Meetings/2010-03#Fire_Extinguishers|3/10 Member Meeting]]). We will need 10 lbs ABC extinguishers, 1 within 75 feet of each other.  
+
* ELECTRICAL
## Mount Smoke and CO Detectors.
+
** Tools area breakers
## Place Emergency Evacuation/Safe Zone Placards; Fire and Disaster
+
** AV area wiring clusterfuck
##* Build and mount an 'EXIT' sign on exits and 'EMERGENCY EXIT' as needed with directions on how to open.  Can be lit. Try glow-in-the-dark paint. (Per [[Meetings/2010-03#Fire_Extinguishers|3/10 Member Meeting]])
+
** Outlets that need attention
##* Designate Safe Zones for Disasters
+
*** Kitchen switch and outlet
## Place Emergency Kits - For Disaster Scenarios; flashlights, radios, survival and medical gear, ect.
+
*** Hallway bathroom
## Establish Hazard and Safety Placards and Procedures Signage
+
*** Office bathroom
## Establish Material Safety Data Sheets & Manuals for Equipment Binder
+
*** Front door
## Bringing Shop Up to Standards and Codes - Fire, Building & Safety
+
 
##* It has been noted that there are some aspects of the shop that are not up to spec for insurance purposes.  Need to research relevant standards and codes and bring shop up to requirements.
+
* PNEUMATIC
##* Radon Test & Mitigation - See [[414StevensAve#Fire/Disaster/Hazards]] under 'Radon'.
+
** Replace leaking hose above 2nd floor CNC Machine
# Summer Appreciation - Making the shop enjoyable through the summer heat. Looking at ECD 5/11. Per [[Shop_Heating_%26_Cooling|Shop Heating & Cooling]]
+
** Get on-demand ventilation for 3-D printers
## Installing A/Cs
+
 
## Weatherization
+
 
 +
* Set up consumables tracking.
 +
** Item "Stock" for shop?
 +
** Items that should always be available (soap, duct tape) are voted on by the membership, and then facilities committee works to keep them in stock.
 +
 
 +
* UPGRAYEDS
 +
** Install water heater timer
 +
** Drywall (+ artwork) around upstairs banister
 +
** Replace bikeshed
 +
** opening office window.
 +
 
 +
* FIRST AID
 +
** [doing] Move main first aid kit out of bathroom.
 +
** Provide floorplan of safety equipment
 +
** Provide on-demand lectures for first aid.
 +
 
 +
* Shop tours? Field trips?
 +
** The shop -- as a nonprofit with the stated goal of spreading the maker spirit -- should be an amazing place for school field trips. Currently I actively avoid them, because there's no way to guarantee that the kids don't encounter a drunk member in the shop. Fixing the problem then censors members in the name of making the shop kid-friendly, which it isn't.
 +
** I think a solution to this dilemma would be to schedule field trips, and then alert the shop that there will be a dry day when no alcohol consumption or obscenity will be tolerated.
 +
 
 +
== Done ==
 +
 
 +
* [[Facilities/Priority_List/Textiles Migration | Textiles Migration]]
 +
 
 +
* Renovate bathroom
 +
** New linoleum floor
 +
** CNC new sink cabinet
 +
** Better fan? Connect fan to outside exhaust?
 +
 
 +
* UNISTRUT
 +
** Install Unistrut for Radio Mast Mount \ Camera Mount
 +
** To be installed either on the corner of the building, or if that is not feasable, behind member storage.
 +
** Ctag and Omegix to install on 2016.05.21 (Cleanup Day)
 +
 
 +
* FABLAB
 +
** Finish installing ceiling.
 +
** Install shelving.
 +
** [done] fablab AC
 +
*** Thanks Travis!
 +
 
 +
* Organize lost and found
 +
** Four shelves. Four weeks.
 +
*** Three weeks to collect item.
 +
*** fourth week anyone can take it.
 +
*** End of the fourth week item is tossed.
 +
** All incoming/outgoing items are cataloged.
 +
 
 +
=== Bathroom Renovation ===
 +
 
 +
==== Dimensions ====
 +
 
 +
Environment:
 +
* Bathroom floor
 +
** 6' x 5'
 +
* Horizontal Trim
 +
** 36 & 1/4" from floor
 +
 
 +
Old Vanity:
 +
* Existing Vanity
 +
** front: 24" x 30"
 +
* Footwell
 +
** 4" x 4"
 +
 
 +
New Vanity:
 +
* Plywood
 +
** 5/16" thick
 +
* New Countertop
 +
** 28" x 25" (w x d)
 +
** 5" tall at rear panel
 +
** 1&1/2" tall at front lip
 +
** 3/4" thick at middle section
 +
* New Vanity Frame
 +
** (36.25 - 5) = 31.25" tall
 +
** 27.5" wide
 +
** 23.5" deep
 +
* Footwell
 +
** 4" x 4"
 +
 
 +
==== Supplies ====
 +
 
 +
* [HAVE - Norm] Countertop
 +
* Floor Tiles ($0.69 per ft^2)
 +
* Adhesive ($13.47 per gallon)
 +
* Rubber Trim ($69.97)
 +
** 4" tall, 120' long
 +
* Glue for Trim ($4.97)
 +
** Probably need two
 +
* Sealer ($15.87 per gallon)
 +
* High Efficiency Toilet ($100)
 +
* Wall Paint ($???)
 +
* Drywall ($12)
 +
 
 +
Estimated Total Cost: $243
 +
 
 +
 
 +
[[Category:Facilities]]

Latest revision as of 19:59, 17 March 2024

Doing

To Do

  • ELECTRICAL
    • Tools area breakers
    • AV area wiring clusterfuck
    • Outlets that need attention
      • Kitchen switch and outlet
      • Hallway bathroom
      • Office bathroom
      • Front door
  • PNEUMATIC
    • Replace leaking hose above 2nd floor CNC Machine
    • Get on-demand ventilation for 3-D printers


  • Set up consumables tracking.
    • Item "Stock" for shop?
    • Items that should always be available (soap, duct tape) are voted on by the membership, and then facilities committee works to keep them in stock.
  • UPGRAYEDS
    • Install water heater timer
    • Drywall (+ artwork) around upstairs banister
    • Replace bikeshed
    • opening office window.
  • FIRST AID
    • [doing] Move main first aid kit out of bathroom.
    • Provide floorplan of safety equipment
    • Provide on-demand lectures for first aid.
  • Shop tours? Field trips?
    • The shop -- as a nonprofit with the stated goal of spreading the maker spirit -- should be an amazing place for school field trips. Currently I actively avoid them, because there's no way to guarantee that the kids don't encounter a drunk member in the shop. Fixing the problem then censors members in the name of making the shop kid-friendly, which it isn't.
    • I think a solution to this dilemma would be to schedule field trips, and then alert the shop that there will be a dry day when no alcohol consumption or obscenity will be tolerated.

Done

  • Renovate bathroom
    • New linoleum floor
    • CNC new sink cabinet
    • Better fan? Connect fan to outside exhaust?
  • UNISTRUT
    • Install Unistrut for Radio Mast Mount \ Camera Mount
    • To be installed either on the corner of the building, or if that is not feasable, behind member storage.
    • Ctag and Omegix to install on 2016.05.21 (Cleanup Day)
  • FABLAB
    • Finish installing ceiling.
    • Install shelving.
    • [done] fablab AC
      • Thanks Travis!
  • Organize lost and found
    • Four shelves. Four weeks.
      • Three weeks to collect item.
      • fourth week anyone can take it.
      • End of the fourth week item is tossed.
    • All incoming/outgoing items are cataloged.

Bathroom Renovation

Dimensions

Environment:

  • Bathroom floor
    • 6' x 5'
  • Horizontal Trim
    • 36 & 1/4" from floor

Old Vanity:

  • Existing Vanity
    • front: 24" x 30"
  • Footwell
    • 4" x 4"

New Vanity:

  • Plywood
    • 5/16" thick
  • New Countertop
    • 28" x 25" (w x d)
    • 5" tall at rear panel
    • 1&1/2" tall at front lip
    • 3/4" thick at middle section
  • New Vanity Frame
    • (36.25 - 5) = 31.25" tall
    • 27.5" wide
    • 23.5" deep
  • Footwell
    • 4" x 4"

Supplies

  • [HAVE - Norm] Countertop
  • Floor Tiles ($0.69 per ft^2)
  • Adhesive ($13.47 per gallon)
  • Rubber Trim ($69.97)
    • 4" tall, 120' long
  • Glue for Trim ($4.97)
    • Probably need two
  • Sealer ($15.87 per gallon)
  • High Efficiency Toilet ($100)
  • Wall Paint ($???)
  • Drywall ($12)

Estimated Total Cost: $243