== Doing ==
 
== Doing ==
 
=== Textiles Migration ===
 
 
==== Status ====
 
* Framing is completed
 
* Old Storage Area has been re-arranged
 
* Old Tool area cleared out and swept.  Tools and materials temporarily stored in not-storage.
 
* Insulation has been collected from Andy C. and Lowell.  Just insulation from ctag left to collect.
 
* We found a roll of black insulation that can be used on project.
 
===== Money Spent =====
 
* $75 On Ramset, Nails, and .22 cartridges for Ramset (Jeff)
 
* $10 on Screws (Michele)
 
 
 
==== The Plan ====
 
# Move equipment from Tool area next to existing fab lab wall
 
## Relocate all shop property in the shelving units next to not-storage. 
 
## Break down both shelving units next to not-storage into scrap, or put on street
 
## Build a work table for the tabletop CNC to go on in this newly vacated area.
 
## Move lockers to next to new work table
 
## Move Radial Arm Saw, Mill, and Vaccuum Former into newly vacated area
 
# Take out unused modules of sawdust collection unit that is run into the existing tool area.
 
# Leave FabLab wall where it is.
 
# Build new wall #1 next to post where radial arm saw currently is.  No entrance.
 
# Build new wall #2, closest to shop tables, with french door
 
# Move Air Conditioners
 
## Move Air conditioner from existing FabLab Wall to the FabLab wall closer to where the shop tables are.
 
## Install spare air conditioner in new wall #2. 
 
## Re-route the auto-draining system from the AirConditioner condensation run-off
 
##* Can we put buckets under the AC temporarily until the room is completed?
 
# Break down textiles table, re-assemble inside new room
 
# Build shelves or bring in narrow tables for sewing machines to be placed.
 
# Move textiles equipment into new room
 
 
==== Building the Walls ====
 
* Framing
 
** We needed a 52 count of 2x4's at a 93" length.  We have 64+ stored in the AV area.
 
* Networking:  Two drops per wall, unterminated, 8 cables total going up to the switch on the balcony like how the fablab is done.
 
* Power:  TBD.  This was a talking point we missed.
 
* Insulation
 
** Using R19 in the Ceiling (240 sqft).  Cost is $140. 
 
*** We can use R30 in the ceiling, but it's more expensive, so unless it's donated we're going R19.
 
** Using R13 in the walls (480 sqft).  Cost is $250.
 
*** <s>Lowell is donating TBD amount of R13 rolls.</s> Collected
 
*** <s>Andy C. (jeff's friend) has kraft faced batting.  Figuring out a pickup time now. </s> Collected
 
*** <s>Barbara may have insulation her father can donate.</s> Her dad is using it, unavailable
 
*** Ctag has a single panel (roughly 8' x 3') of insulation he is bringing to the shop.
 
** We could use blown cellulose for the walls and it would cost $140 (cellulose) + $50 (blower rental).  Seeing how much insulation we can get donated before making this decision.
 
** Plastic Sheeting
 
*** <s>Using black plastic sheeting on the walls.  Cost is $21.</s>  We found a roll from the last insulation, no longer have to purchase more.
 
*** Using white plastic sheeting on the ceilings.  Cost is $25.
 
* Walls: Cost TBD
 
** Using Remaining Peg Board as interior walls.
 
** Using "showerboard" melamine sheeting for external walls, and whatever walls are not covered by the peg board on the inside of the room.
 
** Drywall, which we're not planning on using, is $8 per 4x8 sheet.
 
* Entrance
 
** Going down to one door.  Needs to be a french door so we can move large items in and out.  Pricing at The Restore place soon.
 
 
==== Questions to be answered ====
 
* How many electrical outlets will textiles need, and where? (Phil Answers: In talking with Michelle, we decided to use Wall mounted power strips, like we've done on the Work Tables. A source of these is known to Hunter.)
 
* What existing shelves does textiles want to keep?  Can they keep them, or will the tool area need them? (Phil Opines: Currently the only shelves in the #AreaOfEnclosure are on the north wall(the south wall of the FabLab), they are not pretty. My preference would be to remove them in order to put in more workbench space. We will want to have shelves for equipment storage though.)
 
 
==== Additional Info ====
 
* Location
 
** The textiles room creation planning meeting was held Tuesday May 2nd, 2017 @ 6pm
 
* Funding: Jeff is fronting $300 of risk money and will ask for reimbursement at a later time. 
 
* Work Day(s)
 
** Sunday May 7th will be the first work day for this effort
 
 
==== The Plan We're Not Doing: A.1 ====
 
# Move equipment from Tool area next to existing fab lab wall
 
## Disperse unused shop property from left most shelving unit next to metal supply
 
## Break down left most shelving unit into scrap, or put on street
 
## Build a work table for the tabletop CNC to go on
 
## Move lockers to next to new work table
 
# Take out module of sawdust collection unit that is run into that area.
 
# Move fab lab wall to first wooden post.  Not the wooden post closest to the radial arm saw. 
 
# Build new wall.  Only entrance to area will be from existing fab lab door.
 
# Break down textiles table, re-assemble inside newly expanded room
 
# Build shelves or bring in narrow tables for sewing machines to be placed.
 
# Move textiles equipment into new room
 
  
 
== To Do ==
 
== To Do ==
Line 93: Line 12:
 
*** Front door
 
*** Front door
  
* UNISTRUT
+
* PNEUMATIC
** Install Unistrut for Radio Mast Mount \ Camera Mount
+
** Replace leaking hose above 2nd floor CNC Machine
** To be installed either on the corner of the building, or if that is not feasable, behind member storage.
+
** Get on-demand ventilation for 3-D printers
** Ctag and Omegix to install on 2016.05.21 (Cleanup Day)
+
  
* MEGADOOR
 
** New exterior usb port on door.
 
** usb/nfc auth on back door.
 
** Fix front door wiring
 
  
 
* Set up consumables tracking.
 
* Set up consumables tracking.
 
** Item "Stock" for shop?
 
** Item "Stock" for shop?
 
** Items that should always be available (soap, duct tape) are voted on by the membership, and then facilities committee works to keep them in stock.
 
** Items that should always be available (soap, duct tape) are voted on by the membership, and then facilities committee works to keep them in stock.
 
* VENDING
 
** LED matrix in soda machine
 
** other vending machine Qt interface
 
** Other vending machine item supply
 
  
 
* UPGRAYEDS
 
* UPGRAYEDS
 
** Install water heater timer
 
** Install water heater timer
** [doing] Renovate bathroom
+
** Drywall (+ artwork) around upstairs banister
*** New linoleum floor
+
** Replace bikeshed
*** CNC new sink cabinet
+
** opening office window.
*** Better fan? Connect fan to outside exhaust?
+
 
* Drywall (+ artwork) around upstairs banister
+
* FIRST AID
* Replace bikeshed
+
** [doing] Move main first aid kit out of bathroom.
* Ceiling fan blades in office.
+
** Provide floorplan of safety equipment
* Traction tape on stairs.
+
** Provide on-demand lectures for first aid.
* opening office window.
+
 
 +
* Shop tours? Field trips?
 +
** The shop -- as a nonprofit with the stated goal of spreading the maker spirit -- should be an amazing place for school field trips. Currently I actively avoid them, because there's no way to guarantee that the kids don't encounter a drunk member in the shop. Fixing the problem then censors members in the name of making the shop kid-friendly, which it isn't.
 +
** I think a solution to this dilemma would be to schedule field trips, and then alert the shop that there will be a dry day when no alcohol consumption or obscenity will be tolerated.
 +
 
 +
== Done ==
 +
 
 +
* [[Facilities/Priority_List/Textiles Migration | Textiles Migration]]
 +
 
 +
* Renovate bathroom
 +
** New linoleum floor
 +
** CNC new sink cabinet
 +
** Better fan? Connect fan to outside exhaust?
 +
 
 +
* UNISTRUT
 +
** Install Unistrut for Radio Mast Mount \ Camera Mount
 +
** To be installed either on the corner of the building, or if that is not feasable, behind member storage.
 +
** Ctag and Omegix to install on 2016.05.21 (Cleanup Day)
  
 
* FABLAB
 
* FABLAB
Line 130: Line 56:
 
*** Thanks Travis!
 
*** Thanks Travis!
  
* [done] Organize lost and found
+
* Organize lost and found
 
** Four shelves. Four weeks.
 
** Four shelves. Four weeks.
 
*** Three weeks to collect item.
 
*** Three weeks to collect item.
Line 136: Line 62:
 
*** End of the fourth week item is tossed.
 
*** End of the fourth week item is tossed.
 
** All incoming/outgoing items are cataloged.
 
** All incoming/outgoing items are cataloged.
 
* FIRST AID
 
** [doing] Move main first aid kit out of bathroom.
 
** Provide floorplan of safety equipment
 
** Provide on-demand lectures for first aid.
 
 
* Shop tours? Field trips?
 
** The shop -- as a nonprofit with the stated goal of spreading the maker spirit -- should be an amazing place for school field trips. Currently I actively avoid them, because there's no way to guarantee that the kids don't encounter a drunk member in the shop. Fixing the problem then censors members in the name of making the shop kid-friendly, which it isn't.
 
** I think a solution to this dilemma would be to schedule field trips, and then alert the shop that there will be a dry day when no alcohol consumption or obscenity will be tolerated.
 
 
* BIKESHED
 
** Bikeshedding
 
*** Shasta?
 
** Bikeshed
 
 
== Done ==
 
  
 
=== Bathroom Renovation ===
 
=== Bathroom Renovation ===
Line 199: Line 109:
  
 
Estimated Total Cost: $243
 
Estimated Total Cost: $243
 
=== Stair Treads ===
 
 
Shop has 13 stairs. Need 13 treads.
 
 
Stairs are 32" x 9"
 
 
A pack of 12 traction tape pieces is on the way.
 
 
  
  
 
[[Category:Facilities]]
 
[[Category:Facilities]]

Latest revision as of 19:59, 17 March 2024

Doing

To Do

  • ELECTRICAL
    • Tools area breakers
    • AV area wiring clusterfuck
    • Outlets that need attention
      • Kitchen switch and outlet
      • Hallway bathroom
      • Office bathroom
      • Front door
  • PNEUMATIC
    • Replace leaking hose above 2nd floor CNC Machine
    • Get on-demand ventilation for 3-D printers


  • Set up consumables tracking.
    • Item "Stock" for shop?
    • Items that should always be available (soap, duct tape) are voted on by the membership, and then facilities committee works to keep them in stock.
  • UPGRAYEDS
    • Install water heater timer
    • Drywall (+ artwork) around upstairs banister
    • Replace bikeshed
    • opening office window.
  • FIRST AID
    • [doing] Move main first aid kit out of bathroom.
    • Provide floorplan of safety equipment
    • Provide on-demand lectures for first aid.
  • Shop tours? Field trips?
    • The shop -- as a nonprofit with the stated goal of spreading the maker spirit -- should be an amazing place for school field trips. Currently I actively avoid them, because there's no way to guarantee that the kids don't encounter a drunk member in the shop. Fixing the problem then censors members in the name of making the shop kid-friendly, which it isn't.
    • I think a solution to this dilemma would be to schedule field trips, and then alert the shop that there will be a dry day when no alcohol consumption or obscenity will be tolerated.

Done

  • Renovate bathroom
    • New linoleum floor
    • CNC new sink cabinet
    • Better fan? Connect fan to outside exhaust?
  • UNISTRUT
    • Install Unistrut for Radio Mast Mount \ Camera Mount
    • To be installed either on the corner of the building, or if that is not feasable, behind member storage.
    • Ctag and Omegix to install on 2016.05.21 (Cleanup Day)
  • FABLAB
    • Finish installing ceiling.
    • Install shelving.
    • [done] fablab AC
      • Thanks Travis!
  • Organize lost and found
    • Four shelves. Four weeks.
      • Three weeks to collect item.
      • fourth week anyone can take it.
      • End of the fourth week item is tossed.
    • All incoming/outgoing items are cataloged.

Bathroom Renovation

Dimensions

Environment:

  • Bathroom floor
    • 6' x 5'
  • Horizontal Trim
    • 36 & 1/4" from floor

Old Vanity:

  • Existing Vanity
    • front: 24" x 30"
  • Footwell
    • 4" x 4"

New Vanity:

  • Plywood
    • 5/16" thick
  • New Countertop
    • 28" x 25" (w x d)
    • 5" tall at rear panel
    • 1&1/2" tall at front lip
    • 3/4" thick at middle section
  • New Vanity Frame
    • (36.25 - 5) = 31.25" tall
    • 27.5" wide
    • 23.5" deep
  • Footwell
    • 4" x 4"

Supplies

  • [HAVE - Norm] Countertop
  • Floor Tiles ($0.69 per ft^2)
  • Adhesive ($13.47 per gallon)
  • Rubber Trim ($69.97)
    • 4" tall, 120' long
  • Glue for Trim ($4.97)
    • Probably need two
  • Sealer ($15.87 per gallon)
  • High Efficiency Toilet ($100)
  • Wall Paint ($???)
  • Drywall ($12)

Estimated Total Cost: $243