Difference between revisions of "Facilities/414 Stevens Ave"

From Makers Local 256
Jump to: navigation, search
m (Parking : Added garden illustration in relation to parking)
m (Landlord Responsibilities: removed building notice)
 
(45 intermediate revisions by 5 users not shown)
Line 1: Line 1:
 
{{TOCRight}}
 
{{TOCRight}}
 +
 
== Mailing Address ==
 
== Mailing Address ==
  
== Calendar ==
+
<pre>
 +
PO Box: 2234
 +
Post Office location:
 +
615 CLINTON AVE W
 +
HUNTSVILLE, AL, 35801
 +
</pre>
  
== Planned Organization of Areas ==
+
== Landlord Responsibilities ==
  
=== Lobby with front door ===
+
* Plumbing repair
 +
* Electrical wiring repair
 +
* Structural repair
  
=== Large Office ===
+
== Shop Areas ==
  
=== Kitchen ===
+
=== Dimensions - First Floor ===
  
=== Kitchen Closet ===
+
{| class="wikitable"
 +
|-
 +
! Location !! Floor Size
 +
|-
 +
| Lobby || 6'9" x 20'
 +
|-
 +
| Large Office || 15'6" x 13'
 +
|-
 +
| Kitchen || 10'8" x 13'3"
 +
|-
 +
| Kitchen Hallway || NA
 +
|-
 +
| Kitchen Closet || 6'9" x NA
 +
|-
 +
| Bathrooms || NA
 +
|-
 +
| Main Garage Area || 53'4" x 24'
 +
|-
 +
| Half-Completed Room Under Loft || 11'x15'
 +
|-
 +
| Space Under Loft || 14' wide and ends at South wall of Half-Completed Room Under Loft.
 +
|-
 +
| East Lawn || ~35'x30'
 +
|-
 +
| North Lawn || ~30'x75'
 +
|-
 +
|}
  
=== 2 Bathrooms ===
+
=== Dimensions - Loft ===
  
=== Main Garage Area ===
+
L-shaped section that sits atop office areas and runs along West and North walls of building.
  
=== Garage Loft ===
+
{| class="wikitable"
 +
|-
 +
! Location !! Floor Size
 +
|-
 +
| West Run Above Warehouse || 14' wide
 +
|-
 +
| North Run Above Offices || 15'6" wide
 +
|-
 +
|}
  
=== Half-Completed 11'x15' Room Under Loft ===
+
[[File:MakersGoogleMap4.png]]
  
=== Space Under Loft ===
 
  
=== Lit Driveway Area ===
+
== Organization of Areas ==
 +
[[File:MakersLocal256_MarkIII_Labled.jpg]]
 +
Total Area of 4012 sqft, building is 70'x38'.
  
== Parking ==
+
== Insurance Info ==
On the property, we can have 11 spaces for large cars and 12 spaces for small cars.
+
* 66'x20' gravel lot for regular parking on North edge of property along Stevens Ave. (reference SouthEast corner of the lot is at the telephone pole in the NorthEast corner of the property).  This will grant 7 large car plots at 18'x9' each and 8 small car plots at 7.5'x10' each in a regular configuration. 
+
* 50'x10' space for parallel parking on Eastern edge of property along Schiffman St.  There is a fire hydrant East of the NorthEast telephone pole (55' North of the edge of the East driveway).  To provide fire clearances, the 50'x10' space will need to be directly North of the driveway.  This grants 2 parallel parking spaces at 22'x6.9' for a space. 
+
* 2 regular spaces on the driveway.  To allow for an area for members to work outside, cars ought to park at the end of the driveway.  Only issue is that garage door and lit driveway work area is blocked from street access.
+
* Additional parking possible by parking on the city-owned land North of the shop across Stevens Ave., parallel parking on Stevens Ave. under the highway bridge and parallel parking on the neighbors.
+
  
[[File:MakersGoogleMap2.png]]
+
== Cooling & Heating ==
 +
The following is cooled and heated by an (assumed) 18,000 BTU window A/C unit running off of 220V (predicted to be able to cool/heat 750-1000 sqft):
 +
* Large Office - A/C unit stationed here.
  
== Issues with the Landlord ==
+
The following areas are cooled/heated by proxy to the above room:
 +
* Lobby With Front Door
 +
* Kitchen
 +
* Kitchen Closet
 +
* Kitchen Hallway
 +
* 2 Bathrooms
  
== Insurance Info ==
+
All other indoor areas are uncooled/unheated, they are ventilated by a 700 Watt wall vent fan.
  
== TODO ==
+
Notes: [[Shop_Heating_%26_Cooling|Shop Heating & Cooling]]
Please refer to [[We_Need_to_Move#To_Dos_for_an_Operational_Insurable_Shop|We Need To Move Page]]
+
  
== Cooling ==
+
== Weatherization ==
 +
Per landlord, the following areas have walls insulated to R-19 (needs verification):
 +
* Large Office - Two tall single-glazed slit windows (~4'x1'), one facing East and the other facing North.  One single-glazed observation window (~3'x5') facing to Main Garage Area.  Wall aperture (~1.5'x2') for A/C unit facing East.
 +
* Lobby With Front Door - One tall single-glazed slit window (~4'x1') facing North, one outside entrance (~7'x4') facing North, weatherstripped.
 +
* Kitchen
 +
* Kitchen Closet
 +
* Kitchen Hallway
 +
* 2 Bathrooms
  
== Heating ==
+
All other indoor areas uninsulated.  Recommend weatherization of door between Kitchen Hallway and Main Garage Area for insulation and soundproofing.  Will prevent heat transfer between conditioned and unconditioned areas.
  
 
== Security ==
 
== Security ==
Line 52: Line 103:
  
 
== Safety ==
 
== Safety ==
=== Fire/Distaster/Hazards ===
+
 
 
* Fire Mitigations - ?
 
* Fire Mitigations - ?
* Radon - ?
+
* Disaster Preparedness - ?
 +
* Radon
 +
** As of 5/3/11, from discussion with the board, Facilities Director and concerned parties, the following course of action is recommended:
 +
**# Purchase a radon test kit and perform a self-test.  A test is cheap; up to $15 for a test kit and 3 days to 12 months of testing  (per [http://media.alabama.gov/pr/pr.aspx?id=4541 here]).
 +
**# Ask for a radon clause on the next lease term for our safety and coverage (none on current lease term).  We had one for the 203 Brown St lease stating the building tested as radon safe.  A similar one is recommended that would state landlord responsibility for testing and, if needed, mitigations. 
 +
**# Take action as needed based on the radon test results. 
 +
** The basis of the action is that radon, as a radioactive gas, poses a long-term health risk and that Madison County has a high potential of having dangerous levels of radon (more information [http://www.aces.edu/fcs/hndh/radon/alcountytestresults.php from here]).  To detail, per [http://www.aces.edu/fcs/hndh/radon/publications/nonprogram-counties/testresults/madison.php Madison County Radon Test Results]; in the zip code for 414 Stevens Ave 35801, 2225 homes have tested with an average radon level of 6.05 picoCuries of radiation per litre of air (pCi/l).  Above 4 pCi/l is the recommended action level by EPA and AL Department of Health.  35.78% of the homes tested are over this limit.  Note that building construction affects radon levels.  Therefore, a radon test is needed to accurately confirm elevated levels of radon.
 +
** Notes: Details on Madison County radon levels and testing and mitigation resources [http://www.aces.edu/fcs/hndh/radon/publications/madison-county/index.php here].
 
* General Hazard Mitigations - ?
 
* General Hazard Mitigations - ?
 +
 
=== Chemical & Material ===
 
=== Chemical & Material ===
 
=== Tools ===
 
=== Tools ===
 
=== Members ===
 
=== Members ===
 +
 +
See [[Facilities_Committee_Page#New_Member_Shop_Walkthrough|New Member Shop Walkthrough]].
  
 
== Maintenance & Sanitation ==
 
== Maintenance & Sanitation ==
 +
 +
See [[Facilities_Director#Duties]]
 +
 +
== Utilities ==
 +
 +
=== Water ===
 +
 +
=== Electricity ===
 +
 +
=== Cable/Internet/Phone ===
 +
 +
== Operating Costs ==
 +
 +
* Predicted $1110 avg/mo
 +
** Rent: $850/mo
 +
** Utilities: $260 avg/mo (See [[Field_Trips/5_Points_Workshop#Financial_Analysis|Financial Analysis]])
 +
* Observed: Pending
 +
 +
== Notes ==
 +
* Lot and room dimensions given in 'N-S'x'E-W' orientation.
 +
* [http://mrfranceisbacon.imgur.com/5pts MrFranceIsBacon's Photos]
 +
* [http://throwthemind.com/gallery/index.php?/category/57 JimShoe's Photos]
 +
 +
----
 +
[[Category:Facilities]]

Latest revision as of 03:34, 18 May 2016

Mailing Address

PO Box: 2234
Post Office location:
615 CLINTON AVE W
HUNTSVILLE, AL, 35801

Landlord Responsibilities

  • Plumbing repair
  • Electrical wiring repair
  • Structural repair

Shop Areas

Dimensions - First Floor

Location Floor Size
Lobby 6'9" x 20'
Large Office 15'6" x 13'
Kitchen 10'8" x 13'3"
Kitchen Hallway NA
Kitchen Closet 6'9" x NA
Bathrooms NA
Main Garage Area 53'4" x 24'
Half-Completed Room Under Loft 11'x15'
Space Under Loft 14' wide and ends at South wall of Half-Completed Room Under Loft.
East Lawn ~35'x30'
North Lawn ~30'x75'

Dimensions - Loft

L-shaped section that sits atop office areas and runs along West and North walls of building.

Location Floor Size
West Run Above Warehouse 14' wide
North Run Above Offices 15'6" wide

MakersGoogleMap4.png


Organization of Areas

MakersLocal256 MarkIII Labled.jpg Total Area of 4012 sqft, building is 70'x38'.

Insurance Info

Cooling & Heating

The following is cooled and heated by an (assumed) 18,000 BTU window A/C unit running off of 220V (predicted to be able to cool/heat 750-1000 sqft):

  • Large Office - A/C unit stationed here.

The following areas are cooled/heated by proxy to the above room:

  • Lobby With Front Door
  • Kitchen
  • Kitchen Closet
  • Kitchen Hallway
  • 2 Bathrooms

All other indoor areas are uncooled/unheated, they are ventilated by a 700 Watt wall vent fan.

Notes: Shop Heating & Cooling

Weatherization

Per landlord, the following areas have walls insulated to R-19 (needs verification):

  • Large Office - Two tall single-glazed slit windows (~4'x1'), one facing East and the other facing North. One single-glazed observation window (~3'x5') facing to Main Garage Area. Wall aperture (~1.5'x2') for A/C unit facing East.
  • Lobby With Front Door - One tall single-glazed slit window (~4'x1') facing North, one outside entrance (~7'x4') facing North, weatherstripped.
  • Kitchen
  • Kitchen Closet
  • Kitchen Hallway
  • 2 Bathrooms

All other indoor areas uninsulated. Recommend weatherization of door between Kitchen Hallway and Main Garage Area for insulation and soundproofing. Will prevent heat transfer between conditioned and unconditioned areas.

Security

ADT Alarm System

Cameras

Access Control

Safety

  • Fire Mitigations - ?
  • Disaster Preparedness - ?
  • Radon
    • As of 5/3/11, from discussion with the board, Facilities Director and concerned parties, the following course of action is recommended:
      1. Purchase a radon test kit and perform a self-test. A test is cheap; up to $15 for a test kit and 3 days to 12 months of testing (per here).
      2. Ask for a radon clause on the next lease term for our safety and coverage (none on current lease term). We had one for the 203 Brown St lease stating the building tested as radon safe. A similar one is recommended that would state landlord responsibility for testing and, if needed, mitigations.
      3. Take action as needed based on the radon test results.
    • The basis of the action is that radon, as a radioactive gas, poses a long-term health risk and that Madison County has a high potential of having dangerous levels of radon (more information from here). To detail, per Madison County Radon Test Results; in the zip code for 414 Stevens Ave 35801, 2225 homes have tested with an average radon level of 6.05 picoCuries of radiation per litre of air (pCi/l). Above 4 pCi/l is the recommended action level by EPA and AL Department of Health. 35.78% of the homes tested are over this limit. Note that building construction affects radon levels. Therefore, a radon test is needed to accurately confirm elevated levels of radon.
    • Notes: Details on Madison County radon levels and testing and mitigation resources here.
  • General Hazard Mitigations - ?

Chemical & Material

Tools

Members

See New Member Shop Walkthrough.

Maintenance & Sanitation

See Facilities_Director#Duties

Utilities

Water

Electricity

Cable/Internet/Phone

Operating Costs

  • Predicted $1110 avg/mo
  • Observed: Pending

Notes